
284
GEARCASE
ASSEMBLY
“O” Type Gearcases
Loosen retainer screws 1/4 turn.
Install wedge, screw, and washer. Apply
Ultra
Lock
to threads and torque screw 15 to 20 in. lbs.
(1.7 to 2.3 N·m).
Re-torque two retainer screws to 18 to 20 ft. lbs.
(24 to 27 N·m).
Confirm that torque on the wedge screw is 15 to
20 in. lbs. (1.7 to 2.3 N·m).
To complete gearcase assembly, refer to:
•
LEAK TEST
on p. 259
•
WATER PUMP
on p. 262
•
SHIFT ROD ADJUSTMENT
on p. 265
•
REMOVAL AND INSTALLATION
on p. 260
•
LUBRICANT
on p. 258
•
Propeller Hardware Installation
on p. 65
•
Trim Tab Adjustment
on p. 68.
During break-in period of a reassembled gear-
case, change the gearcase lubricant between 10
to 20 hours of operation.
DSM02291
DSC02361
Summary of Contents for E-tec 75 HP
Page 1: ......
Page 233: ...233 POWERHEAD POWERHEAD VIEWS 10 POWERHEAD VIEWS Port Short Block Starboard Short Block ...
Page 234: ...234 POWERHEAD POWERHEAD VIEWS Port Dressed Powerhead Starboard Dressed Powerhead ...
Page 235: ...235 POWERHEAD POWERHEAD VIEWS 10 Front ...
Page 236: ...236 POWERHEAD POWERHEAD VIEWS Rear ...
Page 237: ...237 POWERHEAD POWERHEAD VIEWS 10 Top ...
Page 298: ...S 2 ...
Page 344: ......