54
INSTALLATION AND PREDELIVERY
OUTBOARD RIGGING
OUTBOARD RIGGING
Cable, Hose, and Wire Routing
Remove cable retainer from anchor block. Apply a
liberal amount of
Triple-Guard
grease to both
anchor block pockets.
Move the remote control handle to NEUTRAL and
confirm that throttle is in the IDLE position.
Apply soapy water to the inside surfaces of grom-
met and install cables and fuel line as shown:
Place the grommet into position in the lower
engine cover.
When grommet is in place and all cables have
been installed, tighten a tie strap around the out-
side of the grommet to form a watertight seal
around the cables.
Control Cable Adjustments
IMPORTANT:
DO NOT complete final attach-
ment of cables to throttle and shift levers until all
cables, wires, and hoses have been routed and
grommet has been placed into the lower engine
cover.
Pull firmly on shift cable casing to remove back-
lash. With outboard in NEUTRAL, place the cable
trunnion into the lower anchor pocket and adjust
the trunnion nut so that the casing fits onto the
shift lever pin.
CAUTION
To prevent accidental starting while servic-
ing, disconnect the battery cables at the
battery. Twist and remove all spark plug
leads.
1.
Cable retainer
002099
1.
Throttle cable
2.
Shift cable
3.
Main wiring harness
4.
Battery cable
5.
Fuel line
001998
1
3
4
5
1
2
002104
1.
Shift lever pin
2.
Trunnion nut
002100
2
1
Summary of Contents for E-tec 75 HP
Page 1: ......
Page 233: ...233 POWERHEAD POWERHEAD VIEWS 10 POWERHEAD VIEWS Port Short Block Starboard Short Block ...
Page 234: ...234 POWERHEAD POWERHEAD VIEWS Port Dressed Powerhead Starboard Dressed Powerhead ...
Page 235: ...235 POWERHEAD POWERHEAD VIEWS 10 Front ...
Page 236: ...236 POWERHEAD POWERHEAD VIEWS Rear ...
Page 237: ...237 POWERHEAD POWERHEAD VIEWS 10 Top ...
Page 298: ...S 2 ...
Page 344: ......