225
POWERHEAD
ASSEMBLY
10
Final torque nuts to 26 to 30 ft. lbs. (35 to 41 N·m).
Apply
Nut Lock
to crankcase flange screws. Install
screws and torque to 60 to 84 in. lbs. (7 to 9.5
N·m).
Test that the crankshaft spins freely without bind-
ing.
IMPORTANT:
After powerhead has been
assembled, allow at least two hours for
Gel-Seal II
to cure before running outboard.
Apply
Gasket Sealing Compound
to both sides of
a new water cover gasket. Position gasket and
cover on cylinder block.
Apply
Nut Lock
to screws and double ended stud
and hand start in cover. Place star washer under
J-clamp and position as shown. Torque all screws
to 60 to 84 in. lbs. (7 to 9.5 N·m).
Install pressure valve assembly. Refer to
PRES-
SURE RELIEF VALVE SERVICING
on p. 200.
Connect crankcase and block-to-block recirculat-
ing hoses. Check valves must flow toward fly-
wheel end of powerhead. Refer to
POWERHEAD
VIEWS
on p. 233 for hose routing.
Install the throttle body and reed plate assemblies.
Refer to Intake Manifold
Assembly
on p. 175.
002096
002105
1.
Double ended stud
2.
J-clamp
002122
1.
Flywheel end
002113
1
2
1
Summary of Contents for E-tec 75 HP
Page 1: ......
Page 233: ...233 POWERHEAD POWERHEAD VIEWS 10 POWERHEAD VIEWS Port Short Block Starboard Short Block ...
Page 234: ...234 POWERHEAD POWERHEAD VIEWS Port Dressed Powerhead Starboard Dressed Powerhead ...
Page 235: ...235 POWERHEAD POWERHEAD VIEWS 10 Front ...
Page 236: ...236 POWERHEAD POWERHEAD VIEWS Rear ...
Page 237: ...237 POWERHEAD POWERHEAD VIEWS 10 Top ...
Page 298: ...S 2 ...
Page 344: ......