SECTION H -REFERENCE -
158
BOLT TORQUE SPECIFICATIONS
Use figures below only if unspecified in the relevant
instructions. Torques are listed for
lubricated
threads or
threads with liquid thread locker. All stover nut threads
should be lubricated with a light oil.
Metric
Grade 10.9
Grade 12.9
M8
25 lb.ft.
29 lb.ft.
M10 47
58
M12 83
100
Inch bolt
shank size
Grade 5
Grade 8
1
/
4
"
9 lb.ft.
13 lb.ft.
5
/
16
" 18 28
3
/
8
" 31 46
7
/
16
" 50 75
1
/
2
" 75 115
5
/
8
" 150 225
INSPECTION AND REGISTRATION
Without researching and writing
an entire book on the subject, it is impossible to give up-to-date information on the process
of inspection and registration in every state. You must call your state Department of Motor Vehicles or its equivalent to get
local procedures and restrictions. Most states have a pamphlet outlining the requirements for composite cars.
E.R.A. has compiled comments from several forums at
http://www.erareplicas.com/statereg.htm
.
All states will require a Certificate of Origin for the kit (supplied by ERA) and reciepts for all major components. Many states
will want to install a new State Identification Plate (in addition to the E.R.A. ID plate).
Most states fall into 4 inspection categories:
1.
Inspections are done only by central or regional motor vehicle inspection stations.
2.
Inspections may be done by a local state inspection station. That is, a branch of the state Motor Vehicle Department.
3.
Inspections may be done by authorized (private) inspection stations.
4.
No direct inspection is necessary.
Summary of Contents for 427 ROADSTER
Page 4: ...SECTION A PARTS NEEDED 4...
Page 13: ...SECTION A PARTS NEEDED 13...
Page 55: ...55 SECTION C CHASSIS PREPARATION Assembling the chassis and preparation for paint...
Page 56: ...56...
Page 70: ...70 SECTION E BODY PREPARATION...
Page 73: ...SECTION E BODY PREPARATION 73...
Page 76: ...SECTION E BODY PREPARATION 76 ebod stripe...
Page 95: ...95 SECTION F SUSPENSION ASSEMBLY...
Page 107: ...107 SECTION G BODY INTERIOR...
Page 117: ...SECTION G BODY INTERIOR 117 eint tunnel...
Page 142: ...142 SECTION H FINAL OPERATIONS...