SECTION D - BODY/CHASSIS ASSEMBLY
64
FRESH AIR CONTROL VALVES
d\lftair
Screw on top of the foot box after putting a bead of caulk
on the bottom flange.
Clamp the duct hose onto the valve. The actuating cable
will be attached later.
Use a wire tie to
secure
the hose to the bracket on the
inside top of the fender.
THROTTLE LINKAGE
Mount the pedal assembly onto the footbox. See page 87
for details.
ID PLATE
Install the ID plate on the driver’s footbox with
1
/
8
"diam. x
3
/
8
"L aluminum blind rivets as shown.
d\idplate
Summary of Contents for 427 ROADSTER
Page 4: ...SECTION A PARTS NEEDED 4...
Page 13: ...SECTION A PARTS NEEDED 13...
Page 55: ...55 SECTION C CHASSIS PREPARATION Assembling the chassis and preparation for paint...
Page 56: ...56...
Page 70: ...70 SECTION E BODY PREPARATION...
Page 73: ...SECTION E BODY PREPARATION 73...
Page 76: ...SECTION E BODY PREPARATION 76 ebod stripe...
Page 95: ...95 SECTION F SUSPENSION ASSEMBLY...
Page 107: ...107 SECTION G BODY INTERIOR...
Page 117: ...SECTION G BODY INTERIOR 117 eint tunnel...
Page 142: ...142 SECTION H FINAL OPERATIONS...