SECTION G - BODY/INTERIOR
137
ebod\spipesup
Bolt together the sets of connecting brackets as shown.
ebod\spipebk1
Position the brackets in place, one end of each set on a
primary pipe, the other end on a side pipe. Position each
set of brackets on pipes diagonally opposite each other so
that they are easily reached.
Tack weld each set of brackets in place. Complete the
welding when the pipes are removed from the car.
REAR HANGER BRACKET
ebod\spipebrk
Bolt the rubber hanger to the chassis and the end of the
bracket. Mounting holes are provided on the angle
support welded between the main chassis rail and the outer
side rail.
Fit the brackets in position against the side pipes and tack
weld in place.
Unbolt the front brackets and rear hangers and remove the
side pipes and primary pipes. Weld the tacked brackets in
place.
Coat the pipes as desired.
Summary of Contents for 427 ROADSTER
Page 4: ...SECTION A PARTS NEEDED 4...
Page 13: ...SECTION A PARTS NEEDED 13...
Page 55: ...55 SECTION C CHASSIS PREPARATION Assembling the chassis and preparation for paint...
Page 56: ...56...
Page 70: ...70 SECTION E BODY PREPARATION...
Page 73: ...SECTION E BODY PREPARATION 73...
Page 76: ...SECTION E BODY PREPARATION 76 ebod stripe...
Page 95: ...95 SECTION F SUSPENSION ASSEMBLY...
Page 107: ...107 SECTION G BODY INTERIOR...
Page 117: ...SECTION G BODY INTERIOR 117 eint tunnel...
Page 142: ...142 SECTION H FINAL OPERATIONS...