SECTION G - BODY/INTERIOR
136
SIDE PIPES
For the under-car system see page 138.
The E.R.A. 427SC was originally designed using an
original set of Cobra 427 side pipes. When we lengthened
the drivers-side footbox, we had to change the primary
pipes to fit. Exhaust systems are available from E.R.A. or
the suppliers listed on page 28.
The outside pipes are available in bare steel or stainless
alloy.
After the brackets are welded on
, the bare steel
can be painted with a VHT type coating (usually must be
re-done every year), ceramic (HPC, Jet-Hot, Airborn
Coatings, etc.) or chrome plated. Stainless pipes will
discolor slightly to light gold. Chrome plating will turn
blue only on the hottest sections of pipe.
We recommend that the primary pipes be
ceramic
coated
.
This decreases the heat radiated in the engine compartment
and extends the life of the pipes. Because of the slip fit
into the side pipes, mask the last 1
1
/
2
" of the outside
surface before coating.
While ERA specifies extra heavy
flanges,
the primary
pipes may have distorted during welding. Use a flat
surface to check their condition. If there is more than
.020" variance from flat, grind, file or mill the surfaces.
Note! Ford numbers the cylinders on the FE engine 1-4 on
the right (passenger’s side) bank, 5-8 on the left side).
The E.R.A. supplied primary pipes may differ from standard
Ford practice and be numbered (from the front) 1-4 on the
left bank, 5-8 on the right.
The 4 longer primary pipes are for the left side.
E.R.A. can optionally weld the brackets onto the side and
primary pipes at the factory.
WELDING THE SUPPORT BRACKETS
Install the primary pipes on the engine, leaving the bolts
slightly loose.
ebod\primpipe
Support the pipes as shown, parallel with the bottom edge
of the rocker. Leave about 1
1
/
2
-2" between each side pipe
and the rocker panel. A soft-faced dead-blow hammer
helps get the pipes all the way on.
Summary of Contents for 427 ROADSTER
Page 4: ...SECTION A PARTS NEEDED 4...
Page 13: ...SECTION A PARTS NEEDED 13...
Page 55: ...55 SECTION C CHASSIS PREPARATION Assembling the chassis and preparation for paint...
Page 56: ...56...
Page 70: ...70 SECTION E BODY PREPARATION...
Page 73: ...SECTION E BODY PREPARATION 73...
Page 76: ...SECTION E BODY PREPARATION 76 ebod stripe...
Page 95: ...95 SECTION F SUSPENSION ASSEMBLY...
Page 107: ...107 SECTION G BODY INTERIOR...
Page 117: ...SECTION G BODY INTERIOR 117 eint tunnel...
Page 142: ...142 SECTION H FINAL OPERATIONS...