SECTION G - BODY/INTERIOR
130
With the front uprights installed as shown above, hold the
nudge bar between them, aligned with the body opening
and with about
3
/
4
" clearance between it and the body.
Transfer the hole locations from the nudge bar to the
uprights.
Drill
3
/
8
" holes in the uprights and install the threaded
inserts with a special tool or a nut and bolt.
ebod\rivnut
HINGE COVERS
The fiberglass covers are different from left to right. Don't
over-tighten the screws.
eint\HINGCVR
FRESH AIR INLET DUCTS
The left and right ducts will only fit one way. Use the
diagram below as a guide.
ebod\fduct
If you wish, paint the inlet screens.
Slip the inlet ducts over the body flanges and secure each
with 4 Phillips screws from the air-intake side.
Secure each hose to the splash panel with clamps as
shown. The rear clamps have speed nuts and are fastened
from inside the engine compartment.
FUEL FILLER CAP
See the notes on disassembly, page 59.
Lubricate
!
Summary of Contents for 427 ROADSTER
Page 4: ...SECTION A PARTS NEEDED 4...
Page 13: ...SECTION A PARTS NEEDED 13...
Page 55: ...55 SECTION C CHASSIS PREPARATION Assembling the chassis and preparation for paint...
Page 56: ...56...
Page 70: ...70 SECTION E BODY PREPARATION...
Page 73: ...SECTION E BODY PREPARATION 73...
Page 76: ...SECTION E BODY PREPARATION 76 ebod stripe...
Page 95: ...95 SECTION F SUSPENSION ASSEMBLY...
Page 107: ...107 SECTION G BODY INTERIOR...
Page 117: ...SECTION G BODY INTERIOR 117 eint tunnel...
Page 142: ...142 SECTION H FINAL OPERATIONS...