Maintenance 8. Cable
162
VT Rev.1
(27) Apply grease to the cables inside the
each Joint sleeve.
Grease: GPL-224
Between Base-Arm #1
: 4.5
±
1g
Between Arm #1-Arm #2 : 4.5
±
1g
Between Arm #2-Arm #3 : 2.8
±
0.5g
Between Arm #3-Arm #4 : 2.8
±
0.5g
Spatula
Sleeve
Apply grease evenly to the entire cable inside the sleeve and the end of the sleeve by
using a slim spatula
When applying the grease, be careful not to attach the grease to the AMP board.
(28) Connect the following connectors to
the controller unit.
A: Power cable connector
B: Signal cable connector
C: Hand I/O connector
D: LED connectors
×
2
D A
C
B
D
(29) Push the controller unit into the base.
Insert the controller unit while moving it to
the right (see the picture).
Then, gently move the plate of the
controller unit to the left and let the thermal
sheet contacts with the wall inside the base.
Move it to the right to insert
Push to the left gently
NOTE
NOTE
Summary of Contents for VT Series
Page 1: ...6 Axis Robots VT series MANIPULATOR MANUAL Rev 1 EM18YR3817F ...
Page 2: ...MANIPULATOR MANUAL VT series Rev 1 ...
Page 8: ...vi VT Rev 1 ...
Page 16: ...TABLE OF CONTENTS xiv VT Rev 1 ...
Page 18: ......
Page 31: ...Setup Operation 2 Specifications VT Rev 1 15 2 4 Outer Dimensions ...
Page 32: ...Setup Operation 2 Specifications 16 VT Rev 1 Unit mm ...
Page 33: ...Setup Operation 2 Specifications VT Rev 1 17 2 5 Standard Motion Range Unit mm ...
Page 130: ......
Page 138: ...Maintenance 3 Manipulator Structure 122 VT Rev 1 3 Manipulator Structure ...