Maintenance 4. Alarm
126
VT Rev.1
The recommended replacement time for the parts (e.g. timing belts, motors, reduction gear
units) is when it reaches the L10 life (time until 10% failure probability). In the dialog
window, the L10 life is displayed as 100%.
4.2.2 How to Edit the Maintenance Information
The configured Maintenance information can be edited in the EPSON RC+.
(1)
Select the EPSON RC+ 7.0 menu-[Tools]-[Maintenance] to display the [Controller
Tools] dialog box.
(2)
To edit the Maintenance information, display the [Maintenance] dialog box.
(3)
Select “General” or specify the axis from the tree to display information of the target
parts.
(4)
Select the alarm to be changed and click the <Change> button.
(5)
Display the [Change Alarm] dialog box and enter any of the following.
Purchase or replacement date of the battery
Date of grease up
Purchase or replacement date of the timing belt
Purchase or replacement date of the motor
Purchase or replacement date of the reduction gear unit
(6)
Click the <OK> button and change the specified alarm information.
The offset can be set for the consumption rate of already installed parts.
Follow the steps below to calculate a rough offset setting value.
1. Measure the usable months for the past operation by HealthRBAnalysis.
2. Confirm the past Motor ON time in the controller status viewer.
3. Calculate a rough offset value with the following formula.
Offset=100
×
Motor On time
24
×
30.4375
×
Usable months
For details, refer to the following manual.
EPSON RC+ 7.0 SPEL+ Language Reference.
NOTE
NOTE
Summary of Contents for VT Series
Page 1: ...6 Axis Robots VT series MANIPULATOR MANUAL Rev 1 EM18YR3817F ...
Page 2: ...MANIPULATOR MANUAL VT series Rev 1 ...
Page 8: ...vi VT Rev 1 ...
Page 16: ...TABLE OF CONTENTS xiv VT Rev 1 ...
Page 18: ......
Page 31: ...Setup Operation 2 Specifications VT Rev 1 15 2 4 Outer Dimensions ...
Page 32: ...Setup Operation 2 Specifications 16 VT Rev 1 Unit mm ...
Page 33: ...Setup Operation 2 Specifications VT Rev 1 17 2 5 Standard Motion Range Unit mm ...
Page 130: ......
Page 138: ...Maintenance 3 Manipulator Structure 122 VT Rev 1 3 Manipulator Structure ...