SEP 2005
MODEL 1000
EQUIPMENT DESCRIPTION
2-12
For operating a printer (in a nonhazardous area) at the GC Controller site, a DB-25 parallel port is
available on the GC Controller's Terminal Board (TB) for field wiring.
For connecting a PC to the GC Controller at the GC Controller site (for setup, operation, or
maintenance in a nonhazardous area), a DB-9 serial port connector is available on the Controller's
front panel.
The STD-Bus Card Cage inside the GC Controller is equipped with two cards. Card slots are
preassigned so that cables can be consistently routed. However, the COM4A Board, the Modem
Board and the Ethernet Board may be piggy-backed in any order on the CPU Board. If the Radicom
modem is used, it must be the top board in the card cage assembly.
An optional stream switching assembly (with either AC or DC solenoids) can be controlled by the
GC Controller, allowing for switching up to 12 streams.
2.3.1.1
Analog Inputs and Outputs
The GC Controller can accommodate eight fully differential analog 4 to 20 mA input signals. Four
of the analog inputs are used by the associated Analyzer, and they are filtered with transient
protection. The additional four input ports provide the ability to accept signals from other Analyzers,
so that the analytical report of the chromatograph can include other information on the gas stream,
such as water or sulphur content. Transient protection and shield terminations are available for these
inputs.
There is capability for a maximum of ten analog outputs. Two analog outputs are available as
standard components of the Controller; the other eight analog outputs are optional. All ten analog
outputs are current type: 4-20 mA, not isolated. Also, all ten analog outputs can be calibrated by the
MON2000 software.
Summary of Contents for Daniel Danalyzer 1000
Page 2: ......
Page 18: ...SEP 2005 MODEL 1000 DESCRIPTION 1 6 Figure 1 1 GC System Functional Block Diagram ...
Page 38: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 6 Figure 2 1 Analyzer Components ...
Page 146: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 92 Figure 3 37 Analyzer Components ...
Page 188: ...SEP 2005 MODEL 1000 MAINTENANCE 5 20 Figure 5 2 Analyzer Components ...
Page 222: ...SEP 2005 MODEL 1000 MAINTENANCE 5 54 This page intentionally left blank ...
Page 228: ...SEP 2005 MODEL 1000 LIST OF APPENDICES A ii This page intentionally left blank ...
Page 260: ...SEP 2005 MODEL 1000 SETTING SOLENOID PURGE FLOWS E 4 This page intentionally left blank ...
Page 282: ...SEP 2005 MODEL 1000 ANALYZER DRAWINGS Addendum 1 2 This page intentionally left blank ...
Page 283: ......
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......
Page 305: ......
Page 306: ......
Page 307: ......
Page 308: ......
Page 309: ......
Page 310: ......
Page 311: ......
Page 312: ......
Page 313: ......
Page 314: ......
Page 316: ......
Page 318: ......
Page 319: ......