MODEL 1000
SEP 2005
INSTALLATION AND SETUP
3-13
3.1.6
Sample Systems Requirements
1
Observe Precautions and W arnings
»
2
Plan Site Location
3
Obtain Supplies and Tools
4
Install Analyzer W iring
Observe the following guidelines for installing GC sample systems
:
Sample Line Length:
If possible, avoid long sample lines. In case of a long sample line, flow
velocity can be increased by decreasing downstream pressure and using by-pass flow via a
speed loop.
Sample Line Tubing Material:
-
Use stainless steel tubing for noncorrosive streams.
-
Ensure tubing is clean and free of grease.
Dryers and Filters in Sample Line:
-
Use small sizes to minimize time lag and prevent back diffusion.
-
Install a minimum of one filter to remove solid particles. Most applications require
fine-element filters upstream of the Analyzer.
-
Do
use ceramic or porous metallic type filters.
Do not
use cork or felt filters.
Pressure Regulators and Flow Controllers in Sample Line:
Do not
use types containing cork or
felt filters, or absorbent diaphragms.
Pipe Threads, Dressing:
Do
use Teflon tape.
Do not
use pipe thread compounds (dope).
Valving
:
-
Install a block valve downstream of sample takeoff point for maintenance and
shutdown.
-
Block valve should be gate valve or cock valve type, of proper material and packing,
and rated for process line pressure.
Summary of Contents for Daniel Danalyzer 1000
Page 2: ......
Page 18: ...SEP 2005 MODEL 1000 DESCRIPTION 1 6 Figure 1 1 GC System Functional Block Diagram ...
Page 38: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 6 Figure 2 1 Analyzer Components ...
Page 146: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 92 Figure 3 37 Analyzer Components ...
Page 188: ...SEP 2005 MODEL 1000 MAINTENANCE 5 20 Figure 5 2 Analyzer Components ...
Page 222: ...SEP 2005 MODEL 1000 MAINTENANCE 5 54 This page intentionally left blank ...
Page 228: ...SEP 2005 MODEL 1000 LIST OF APPENDICES A ii This page intentionally left blank ...
Page 260: ...SEP 2005 MODEL 1000 SETTING SOLENOID PURGE FLOWS E 4 This page intentionally left blank ...
Page 282: ...SEP 2005 MODEL 1000 ANALYZER DRAWINGS Addendum 1 2 This page intentionally left blank ...
Page 283: ......
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......
Page 305: ......
Page 306: ......
Page 307: ......
Page 308: ......
Page 309: ......
Page 310: ......
Page 311: ......
Page 312: ......
Page 313: ......
Page 314: ......
Page 316: ......
Page 318: ......
Page 319: ......