WARRANTY CLAIM PROCEDURES
To make a warranty claim, you, the Purchaser, must:
1.
Provide Daniel Measurement Services (DMS), a division of Emerson Process Management,
with proof of the Date of Purchase and proof of the Date of Shipment of the product in
question.
2.
Return the product to DMS within twelve (12) months of the date of original shipment of the
product, or within eighteen (18) months of the date of original shipment of the product to
destinations outside of the United States. The Purchaser must prepay any shipping charges.
In addition, the Purchaser is responsible for insuring any product shipped for return, and
assumes the risk of loss of the product during shipment.
3.
To obtain Warranty service or to locate the nearest DMS office, sales, or service center call
(713) 827-6314, Fax (713) 827-6312 write to:
Daniel Measurement Services
a division of Emerson Process Management
11100 Brittmoore Park Drive
Houston, Texas 77041
Or contact DMS via the following site:
www.emersonprocess.com/daniel
4.
When contacting DMS for product service, the Purchaser is asked to provide information
as indicated on the following page entitled "Customer Repair Report".
5.
For product returns from locations outside the United States, it will be necessary for you to
obtain the import consignment address so that DMS’s customs broker can handle the
importation with the U.S. Customs Service.
6.
DMS offers both on call and contract maintenance service designed to afford single source
responsibility for all its products.
7.
DMS reserves the right to make changes at any time to any product to improve its design and
to insure the best available product.
Summary of Contents for Daniel Danalyzer 1000
Page 2: ......
Page 18: ...SEP 2005 MODEL 1000 DESCRIPTION 1 6 Figure 1 1 GC System Functional Block Diagram ...
Page 38: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 6 Figure 2 1 Analyzer Components ...
Page 146: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 92 Figure 3 37 Analyzer Components ...
Page 188: ...SEP 2005 MODEL 1000 MAINTENANCE 5 20 Figure 5 2 Analyzer Components ...
Page 222: ...SEP 2005 MODEL 1000 MAINTENANCE 5 54 This page intentionally left blank ...
Page 228: ...SEP 2005 MODEL 1000 LIST OF APPENDICES A ii This page intentionally left blank ...
Page 260: ...SEP 2005 MODEL 1000 SETTING SOLENOID PURGE FLOWS E 4 This page intentionally left blank ...
Page 282: ...SEP 2005 MODEL 1000 ANALYZER DRAWINGS Addendum 1 2 This page intentionally left blank ...
Page 283: ......
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......
Page 305: ......
Page 306: ......
Page 307: ......
Page 308: ......
Page 309: ......
Page 310: ......
Page 311: ......
Page 312: ......
Page 313: ......
Page 314: ......
Page 316: ......
Page 318: ......
Page 319: ......