SEP 2005
MODEL 1000
2350 to 2350A CPU RETROFIT INSTRUCTIONS
F-12
(5)
Loosen the four screws that secure the Card Cage Assembly to the chassis. Then remove the
Card Cage Assembly away from its chassis mount so that it is easy to work on.
(6)
Locate the System Interface and Driver board. It is mounted to the top of the Card Cage
Assembly.
a)
Disconnect the Analog cable from J6 on the System Interface Board, then disconnect
all CPU cables from the System Interface Board.
b)
Remove the CPU assembly and install the COM4A Board, with associated mounting
hardware to J19 and J20 PC/104 Bus connector on the CPU assembly.
c)
Connect COM5 (P22) and COM6 (P23) on the Field Termination Board via cable
(P/N 3-2350-085) to J6 on COM4A.
d)
Connect COM7 (P24) on the Field Termination Board and COM8 via cable (P/N
3-2350-086) to J3 on COM4A.
e)
Install the CPU assembly into the third slot of card cage. Connect the CPU cables as
detailed in Section 6.3 Basic 2350A Configuration.
f)
Install the DB9 connector from COM5 to P22 on the Field Termination Board with
jackpost assemblies.
g)
Install the DB9 connector from COM6 to P23 on the Field Termination Board with
jackpost assemblies.
h)
Install the DB9 connector from COM7 to P24 on the Field Termination Board with
jackpost assemblies.
i)
Install the ten position connector from COM8 to J12 on the System Interface Board.
j)
Connect the Analog cable to J6 on the System Interface Board.
Refer to Section 3.4.4.1 for port configuration, RS-232, RS-422 and RS-485 and pin outs.
Summary of Contents for Daniel Danalyzer 1000
Page 2: ......
Page 18: ...SEP 2005 MODEL 1000 DESCRIPTION 1 6 Figure 1 1 GC System Functional Block Diagram ...
Page 38: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 6 Figure 2 1 Analyzer Components ...
Page 146: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 92 Figure 3 37 Analyzer Components ...
Page 188: ...SEP 2005 MODEL 1000 MAINTENANCE 5 20 Figure 5 2 Analyzer Components ...
Page 222: ...SEP 2005 MODEL 1000 MAINTENANCE 5 54 This page intentionally left blank ...
Page 228: ...SEP 2005 MODEL 1000 LIST OF APPENDICES A ii This page intentionally left blank ...
Page 260: ...SEP 2005 MODEL 1000 SETTING SOLENOID PURGE FLOWS E 4 This page intentionally left blank ...
Page 282: ...SEP 2005 MODEL 1000 ANALYZER DRAWINGS Addendum 1 2 This page intentionally left blank ...
Page 283: ......
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......
Page 305: ......
Page 306: ......
Page 307: ......
Page 308: ......
Page 309: ......
Page 310: ......
Page 311: ......
Page 312: ......
Page 313: ......
Page 314: ......
Page 316: ......
Page 318: ......
Page 319: ......