SEP 2005
MODEL 1000
EQUIPMENT DESCRIPTION
2-4
2.1.5
Valving
A block valve should be installed immediately downstream of the sample takeoff point to permit
shutdown of the system for maintenance. Block valves should be either gate valves or cocks of the
proper material and packing, and should be rated for the process line pressure. Tight seating of all
connections is essential.
2.1.6
Calibration Gas
A calibration gas used for Process analysis should be blended to Primary Standards. Primary
Standards are blended using weights that are traceable to the National Bureau of Standards (NBS).
If the calibration standard is a gas, the standard should not have any component that could drop out
at the coldest temperature to which the gas will be subjected. A typical blend for a temperature of
zero degrees Fahrenheit (0°F) is listed in the following table. No dropout will occur in this
calibration gas if it is blended at a pressure below 250 psig.
Table 2-1. Contents of Example Calibration Gas
Gas
Mole Percent
Nitrogen
2.5
Carbon dioxide
0.5
Methane
Balance
Ethane
5.0
Propane
1.0
Isobutane
0.3
N-butane
0.3
Neopentane
0.1
Isopentane
0.1
N-pentane
0.1
N-hexane
0.03
If a liquid calibration standard is being used, the head pressure must be sufficient to prevent
bubble-out of components during hot weather.
Summary of Contents for Daniel Danalyzer 1000
Page 2: ......
Page 18: ...SEP 2005 MODEL 1000 DESCRIPTION 1 6 Figure 1 1 GC System Functional Block Diagram ...
Page 38: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 6 Figure 2 1 Analyzer Components ...
Page 146: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 92 Figure 3 37 Analyzer Components ...
Page 188: ...SEP 2005 MODEL 1000 MAINTENANCE 5 20 Figure 5 2 Analyzer Components ...
Page 222: ...SEP 2005 MODEL 1000 MAINTENANCE 5 54 This page intentionally left blank ...
Page 228: ...SEP 2005 MODEL 1000 LIST OF APPENDICES A ii This page intentionally left blank ...
Page 260: ...SEP 2005 MODEL 1000 SETTING SOLENOID PURGE FLOWS E 4 This page intentionally left blank ...
Page 282: ...SEP 2005 MODEL 1000 ANALYZER DRAWINGS Addendum 1 2 This page intentionally left blank ...
Page 283: ......
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......
Page 305: ......
Page 306: ......
Page 307: ......
Page 308: ......
Page 309: ......
Page 310: ......
Page 311: ......
Page 312: ......
Page 313: ......
Page 314: ......
Page 316: ......
Page 318: ......
Page 319: ......