MODEL 1000
SEP 2005
2350 to 2350A CPU RETROFIT INSTRUCTIONS
F-9
F.3
BASIC 2350A CONFIGURATION
At this point, install, if any, all mounting hardware and optional PC/104 boards onto the 2350A CPU
Board.
(1)
Install the 2350A CPU (P/N 3-2350-090) into slot 3 of the card cage assembly.
(2)
Install cables on the CPU Board in the following sequence:
(a)
Digital I/O cable (P/N 3-2350-081) from CPU J7 to the System Interface Board J2.
(b)
Digital I/O cable (P/N 3-2350-080) from CPU J4 to the System Interface Board J3.
(c)
COM1, COM2, and the printer cable (P/N 3-2350-083) from CPU J1 to the System
Interface Board J4, J9, and J11.
d)
COM3 and COM4 can be configured two different ways. To configure a system
WITHOUT
a keyboard and display, connect cable (P/N 3-2350-084) from CPU J6
to the System Interface Board J8 and J10. This provides access to COM3 on J10 and
COM4 on J11 of the Field Termination Board. The serial port setup in the
MON2000 Software for COM4 must be selected as a PC port.
(e)
For a system
WITH
a keyboard and display, connect cable (P/N 3-2350-087) from
CPU J6 to the System Interface J8 and J12. This provides access to COM3 on J10
and COM4 is dedicated for use as a serial interface to the keyboard and display.
COM4 will not be available at J11 of the Field Termination Board. The serial port
setup in the MON2000 Software for COM4 must be selected as Front Panel. See
Figure F-5a.
If all four serial ports are required for communications on a system with keyboard
and display, an optional COM4A Board must be installed and a COM7 and COM8
cable (P/N 3-2350-086) connected (see Section 4.0 below). The serial port setup in
the MON2000 Software for COM8 must be configured as Front Panel. See Figure
F-5b.
(f)
Reinstall the Analog cable to J6 on the System Interface Board.
Summary of Contents for Daniel Danalyzer 1000
Page 2: ......
Page 18: ...SEP 2005 MODEL 1000 DESCRIPTION 1 6 Figure 1 1 GC System Functional Block Diagram ...
Page 38: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 6 Figure 2 1 Analyzer Components ...
Page 146: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 92 Figure 3 37 Analyzer Components ...
Page 188: ...SEP 2005 MODEL 1000 MAINTENANCE 5 20 Figure 5 2 Analyzer Components ...
Page 222: ...SEP 2005 MODEL 1000 MAINTENANCE 5 54 This page intentionally left blank ...
Page 228: ...SEP 2005 MODEL 1000 LIST OF APPENDICES A ii This page intentionally left blank ...
Page 260: ...SEP 2005 MODEL 1000 SETTING SOLENOID PURGE FLOWS E 4 This page intentionally left blank ...
Page 282: ...SEP 2005 MODEL 1000 ANALYZER DRAWINGS Addendum 1 2 This page intentionally left blank ...
Page 283: ......
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......
Page 305: ......
Page 306: ......
Page 307: ......
Page 308: ......
Page 309: ......
Page 310: ......
Page 311: ......
Page 312: ......
Page 313: ......
Page 314: ......
Page 316: ......
Page 318: ......
Page 319: ......