SEP 2005
MODEL 1000
MAINTENANCE
5-18
5.5.4.4
Leak-Checking the Analyzer
To perform a field-service leak check of the Analyzer, follow these steps
:
(1)
Plug all Analyzer vents.
(2)
Make sure the setting of the regulator for the carrier gas cylinder is 115 pounds per square
inch, gauge (psig).
(3)
Check all fittings at the pressure regulator flow panel and at the carrier cylinder regulator
with a leak detector. Correct any leaks detected by a bubble indication.
(4)
Turn the carrier gas cylinder shut-off valve clockwise to close. Observe the carrier gas
pressure for 10 minutes to check for a drop in carrier pressure. The drop should be less than
200 psig on the high side of the regulator/gauge. If the carrier pressure remains constant, no
leaks are present.
(5)
Actuate the VALVE ON/OFF switches and observe the pressure with the valves in different
positions than in step (4). (When the valves are switched, some pressure change is normal
because of carrier loss. Momentarily open cylinder valve to restore pressure if necessary.)
(6)
If the pressure does not hold constant, check all valve fittings for tightness.
(7)
Repeat step (5) again. If leaks persist, check the valve ports with a commercial leak detector
for helium or other carrier gas.
Do not use a liquid leak detector on the valves or
components in the Analyzer oven
(within the black insulated cover).
Summary of Contents for Daniel Danalyzer 1000
Page 2: ......
Page 18: ...SEP 2005 MODEL 1000 DESCRIPTION 1 6 Figure 1 1 GC System Functional Block Diagram ...
Page 38: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 6 Figure 2 1 Analyzer Components ...
Page 146: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 92 Figure 3 37 Analyzer Components ...
Page 188: ...SEP 2005 MODEL 1000 MAINTENANCE 5 20 Figure 5 2 Analyzer Components ...
Page 222: ...SEP 2005 MODEL 1000 MAINTENANCE 5 54 This page intentionally left blank ...
Page 228: ...SEP 2005 MODEL 1000 LIST OF APPENDICES A ii This page intentionally left blank ...
Page 260: ...SEP 2005 MODEL 1000 SETTING SOLENOID PURGE FLOWS E 4 This page intentionally left blank ...
Page 282: ...SEP 2005 MODEL 1000 ANALYZER DRAWINGS Addendum 1 2 This page intentionally left blank ...
Page 283: ......
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......
Page 305: ......
Page 306: ......
Page 307: ......
Page 308: ......
Page 309: ......
Page 310: ......
Page 311: ......
Page 312: ......
Page 313: ......
Page 314: ......
Page 316: ......
Page 318: ......
Page 319: ......