SEP 2005
MODEL 1000
MAINTENANCE
5-14
5.5.4
Analyzer Troubleshooting Guide
A process gas chromatograph can operate properly only if flows are balanced and constant, the
temperature is constant, no leaks are present, and the GC Controller is correctly timed. Before going
through the troubleshooting procedures, perform the routines of the Analyzer Maintenance Checklist.
Checklist records performed regularly may indicate problems and prevent any sudden breakdown.
Do not adjust any values if they are within the nominal tolerance values on the Checklist. Compare
the values with those obtained in preceding weeks. This may pinpoint your problem immediately.
The following is a guide for troubleshooting if a problem with sample analysis occurs. Table 5-2
is a Troubleshooting Checklist to obtain data for a problem diagnosis. This data will be useful if it
becomes necessary to call the Daniel Measurement Services (DMS), a division of Emerson Process
Management, for assistance.
5.5.4.1
Flow Balance Check
a.
Ensure that the flow panel gauge is properly set. Refer to the Analyzer Maintenance
Checklist for values. Do not adjust; check with Daniel Measurement Services (DMS), a
division of Emerson Process Management, if your reading is abnormal.
b.
Check flow at the measure vent and sample vent (see Troubleshooting Checklist).
5.5.4.2
Temperature
Ensure that the temperature is constant in both the Analyzer and Sample Conditioning System (SCS)
oven (refer to paragraph 5.5.7).
Summary of Contents for Daniel Danalyzer 1000
Page 2: ......
Page 18: ...SEP 2005 MODEL 1000 DESCRIPTION 1 6 Figure 1 1 GC System Functional Block Diagram ...
Page 38: ...SEP 2005 MODEL 1000 EQUIPMENT DESCRIPTION 2 6 Figure 2 1 Analyzer Components ...
Page 146: ...SEP 2005 MODEL 1000 INSTALLATION AND SETUP 3 92 Figure 3 37 Analyzer Components ...
Page 188: ...SEP 2005 MODEL 1000 MAINTENANCE 5 20 Figure 5 2 Analyzer Components ...
Page 222: ...SEP 2005 MODEL 1000 MAINTENANCE 5 54 This page intentionally left blank ...
Page 228: ...SEP 2005 MODEL 1000 LIST OF APPENDICES A ii This page intentionally left blank ...
Page 260: ...SEP 2005 MODEL 1000 SETTING SOLENOID PURGE FLOWS E 4 This page intentionally left blank ...
Page 282: ...SEP 2005 MODEL 1000 ANALYZER DRAWINGS Addendum 1 2 This page intentionally left blank ...
Page 283: ......
Page 284: ......
Page 285: ......
Page 286: ......
Page 287: ......
Page 288: ......
Page 289: ......
Page 290: ......
Page 291: ......
Page 292: ......
Page 293: ......
Page 294: ......
Page 295: ......
Page 296: ......
Page 299: ......
Page 300: ......
Page 301: ......
Page 302: ......
Page 303: ......
Page 304: ......
Page 305: ......
Page 306: ......
Page 307: ......
Page 308: ......
Page 309: ......
Page 310: ......
Page 311: ......
Page 312: ......
Page 313: ......
Page 314: ......
Page 316: ......
Page 318: ......
Page 319: ......