![Embraer EMB-505 Phenom Service Manual Download Page 181](http://html1.mh-extra.com/html/embraer/emb-505-phenom/emb-505-phenom_service-manual_2399645181.webp)
GROUND HANDLING AND
SERVICING HANDBOOK
EFFECTIVITY: ALL
32-00-00-910-801-A/200
Page 201
NOV 20/09
H
A
R
D
C
O
P
Y
I
S
U
N
C
O
N
TR
O
L
L
E
D
.
O
N
C
E
P
R
IN
TE
D
,
T
H
IS
P
A
G
E
M
U
S
T
N
O
T
B
E
R
E
T
A
IN
E
D
FO
R
F
U
TU
R
E
R
E
F
E
R
E
N
C
E
.
B
E
FO
R
E
U
S
IN
G
,
M
A
K
E
S
U
R
E
TH
IS
H
A
R
D
C
O
P
Y
I
S
T
H
E
L
A
TE
S
T
IS
S
U
E
.
Copyright © by EMBRAER S.A - All rights reserved - See title page for details.
GHSH TASK 32-00-00-910-801-A
1. Landing-Gear Safety Pin - Standard Practices
A. General
(1) The landing-gear safety pins must be installed while the aircraft is parked,
during maintenance procedures, and during the towing of the aircraft.
B. Job Set-Up
WARNING: MAKE SURE THAT THE AIRCRAFT IS IN A SAFE
CONDITION BEFORE YOU DO THE MAINTENANCE
PROCEDURES. THIS IS TO PREVENT INJURY TO
PERSONS AND/OR DAMAGE TO THE EQUIPMENT.
(1) Make sure that the landing gear control lever is in the DOWN position.
C. Landing-Gear Safety Pin - Location
(1) Use the landing-gear safety pins to lock the nose and main landing gears
down.
(2) Make sure that personnel can see the red REMOVE-BEFORE-FLIGHT
streamer clearly.
Summary of Contents for EMB-505 Phenom
Page 2: ......
Page 6: ......
Page 10: ......
Page 12: ......
Page 26: ......
Page 30: ......
Page 48: ......
Page 62: ......
Page 76: ......
Page 80: ......
Page 84: ......
Page 88: ......
Page 102: ......
Page 108: ......
Page 128: ......
Page 142: ......
Page 150: ......
Page 168: ......
Page 180: ......
Page 188: ......
Page 192: ......
Page 194: ......
Page 196: ......
Page 198: ......
Page 208: ......
Page 222: ......