Installation
Eaton ePDU G3 Operation Manual P-164000277—Rev 5
34
6.
If your model uses grip plug retention levers on the outlet plugs, make the lever in the “O” position before
inserting the plug.
7.
Connect your output devices to the outlet outlets on the ePDU. Verify that each device is receiving power
before connecting the next device.
8.
If your model uses grip plug retention levers, gently rotate the lever to the “+” position. You should hear a
“click” sound as the mechanism engages.
9.
Route all power cords neatly. If desired, use cable ties to secure the cords.
Operating the ePDU
See “Operation Overview” on page 35 for instructions to operate the ePDU, including starting and shutting
down the equipment.
NOTE
To avoid large surge currents, connect the protected equipment to the outlets
individually rather than as a group. You may want to include a delay for Switched and
Managed models when setting up groups of outlets to start at the same time to
avoid a large in-rush current.
NOTE
Only unplug the power cord when the grip plug retention mechanism is in the “+”
position in an emergency. To remove the plug, gently rotate the lever to the “O”
position and remove the plug.