Installation
Eaton ePDU G3 Operation Manual P-164000277—Rev 5
21
Using Mounting Buttons Installed on Clip Feet
To install the ePDU with mounting buttons installed on the mounting clip feet:
1.
Locate the two mounting clip feet, M6 flathead screws, two spare plastic mounting buttons, and
mounting hardware (M4 screws and M4 hex nuts, or M3 screws). Using a Phillips screwdriver, assemble
the mounting buttons and clip feet (see Figure 18).
Figure 18. Attaching the Mounting Buttons to the Mounting Clip Feet
2.
Mount the two clip assemblies in keyholes spread far enough apart to stabilize the top and bottom of the
ePDU when mounted on the rail. See “Chassis Hole Pattern (EMEA models only)” on page 17 for more
information.
3.
Carefully move the ePDU into position against the rail.
4.
Snap the clip feet onto the ePDU at the desired vertical position.
5.
Align the clip feet and slide the mounting button into the keyhole slots.
6.
Push down to make sure the ePDU is secured into position.
7.
Continue to “Grounding the ePDU” on page 28 if you are installing a ground screw and grounding cable.
Otherwise, go to “Network and Environmental Ports” on page 29.
NOTE
For EMEA models, the M3 nuts are factory-installed in the clip feet.