
NM2B
REPLACEMENT PROCEDURES (continued)
4.8.15
Open the oxygen cylinder valve and set the System Power switch to
ON.
4.8.16
Set the oxygen flow to five liters per minute.
4.8.17
Close the oxygen cylinder valve.
4.8.18
As the pressure drops, the O
2
SUPPLY alarm should activate when
the pressure is between 40 and 34 psi as shown on the test gauge.
4.8.19
If the alarm activates when the pressure is below 34 psi, turn the
adjustment wheel counter-clockwise, repeat the test and adjust as
necessary to bring the set point into the correct range.
If the alarm activates when the pressure is above 40 psi, turn the
adjustment wheel clockwise,repeat the test and adjust as necessary
to bring the set point into the correct range.
4.8.20
Set the System Power switch to
STANDBY
.
4.8.21
Disconnect the test gauge and replace the plug in the regulator line
TEE fitting.
4.8.22
Replace the table top and its retaining screws.
4.8.23
Replace the rear cover and its retaining screws.
4.8.24
Connect the pipeline hoses.
4.8.25
Perform the PMS Procedure given in Section 6.
Rev. A
4-27
Summary of Contents for Narkomed 2B
Page 2: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Page 18: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Page 32: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Page 240: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Page 244: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Page 306: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...