
NM2B
REPLACEMENT PROCEDURES (continued)
4.6.14
Set the System Power switch to ON.
4.6.15A For the O
2
flow control valve:
Open the oxygen cylinder valve.
Turn the flow control valve clockwise until the flow rate will not
drop any further. (If the machine has been modified to eliminate
the minimum flow feature, turn the valve until the flow rate is
zero.)
4.6.15B For the other gas flow control valves:
Open the oxygen cylinder valve, and open the cylinder valve
corresponding to the flow control valve replacement.
Set the oxygen flow rate to four liters per minute.
Turn the other gas flow control valve clockwise until the flow
rate is zero.
4.6.16
Place the knob on the flow control valve shaft and turn it clockwise
until it engages the stop pin. Tighten one of the knob setscrews.
4.6.17
Turn the knob in both directions and ensure that the flow can be
controlled over its entire range. When the valve is closed, the knob
should be against the clockwise stop. Tighten the remaining setscrew.
4.6.18
If the knob label is not horizontal when the valve is closed, remove
the label and install a new label in the correct position.
4.6.19
Connect the pipeline hoses.
4.6.20
Perform the PMS Procedure given in Section 6.
Rev. A
4-21
Summary of Contents for Narkomed 2B
Page 2: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Page 18: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Page 32: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Page 240: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Page 244: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...
Page 306: ...RETURN TO THIS MANUAL S TABLE OF CONTENTS RETURN TO CD ROM TABLE OF CONTENTS ...