Operation and Installation Manual for SOLIVIA 2.0/2.5/3.0/3.3/3.6/5.0 EU G4 TR
8. Commissioning
EN
➔
continue
Baudrate: 19200
ID: 1
-------------------
-------------------
RS485
16. Press the
buttons to select
continue
and then
press the button.
→ The completion screen will be displayed.
to reselect
ESC:
to confirm
ENTER:
17. Press the button to complete commissioning.
or
Press the button to change settings.
þ
Commissioning is now finished.
nOTE
► If the solar inverter is configured to the
DE
LVD
oder
DK LVD
grids, you can also con-
figure active and reactive power control, see
“10.9 Active Power Control”, p. 56.
► The solar inverter offers some optional
functions available for all grids, see
“10 Set-
tings”, p. 52.
► When done with commissioning, save
the settings (see
“11.4 Saving Settings”,
p. 65
) and swap data (see
“11.6 Saving
Swap Data”, p. 67
) to a USB drive in
order to be able to use them later.