
35
Operation and Installation Manual for SOLIVIA 2.0/2.5/3.0/3.3/3.6/5.0 EU G4 TR
8. Commissioning
EN
8.3
Commissioning for En 50438 and VDE 0126 Grids
The standard commissioning is valid for the following countries and grids.
Country
Grid
notes
Belgium
BE C10/11 12
Bulgaria
BG
France
FR UTE
Greece
GR
and
GR ISLAND
Italy
IT BT 21 > 6kW
Italy as per CEI 0-21:2012-06 for PV
systems greater than 6 kW.
Netherlands
NL
Portugal
PT
Romania
RO
Slovakia
SK
Spain
ES ISLAND
,
ES RD661
and
ES RD1699
Czech Republic
CZ
United Kingdom
UK G59-2 230
United Kingdom as per G59-2 230 V
and 240 V
UK G59-2 240
UK 83-1
United Kingdom as per G83-1
1. Check all connections and cables for damage and correct
seating. Correct the installation if necessary.
DC DISCONNECT
OFF
ON
2. Switch on the DC isolating switch.
→ The startup process of the solar inverter will begin.
After the startup process and the automatic self-test,
the commissioning procedure of the inverter starts
and the
Installation
menu is displayed.
➔
continue
Language: English
-------------------
Installation
3. To change the language, press the button and then
set the language using the
buttons. Press the
button to apply the language.
Available languages:
Czech | Danish | Dutch | English |
French | German | Italian | Polish |
Portuguese | Romanian | Slovak |
Slovenian | Spanish
➔
-------------------
continue
Language: English
-------------------
Installation
4. Press the
buttons to select
more
and then press
the button.
→ This displays the
Load USB Data
menu.
➔
-------------------
No
Yes
-------------------
Load USB data
5. Press the
buttons to select
No
and then press the
button.
→ The
Grid Selection
menu is displayed.
➔
continue
Grid: CZ
-------------------
Grid selection
6. To change the grid, press the button and then set
the grid using the
buttons. Press the button to
apply the grid.
nOTE
: Here you can select the proper
grid for your country.
➔
-------------------
continue
Grid: CZ
-------------------
Grid selection
7. Press the
buttons to select
more
and then press
the button.
→ The
Locked Power Limit
menu is displayed.