
8. Commissioning
Operation and Installation Manual for SOLIVIA 2.0/2.5/3.0/3.3/3.6/5.0 EU G4 TR
34
8.
Commissioning
8.1
Before You Begin
The solar inverter must be correctly installed, see
“7 Installation”,
p. 24
.
Information on operating the display can be found in
“5.4 Display
and Buttons”, p. 14
.
nOTE
As long as the commissioning procedure has not
been completed, you can go back to any point
in the commissioning procedure at any time by
pressing the
ESC
button.
nOTE
Always read through each step before starting
the commissioning procedure.
8.2
Selecting the Correct Commissioning
Procedure
The solar inverter must be newly installed:
Country
Grid (as shown on dis-
play)
Description
Applicable Commissioning Procedure
Belgium
BE C10/11 12
Belgium as per C10/11, Issue 2012
“8.3 Commissioning for EN 50438 and VDE
0126 Grids”, p. 35
Bulgaria
BG
Bulgaria
Czech Republic
CZ
Czech Republic
Germany
DE LVD
Germany as per VDE AR N 4105
“8.4 Commissioning for VDE AR N 4105
Grids”, p. 38
Denmark
DK LVD
Denmark as per VDE AR N 4105
France
FR UTE
France as per UTE
“8.3 Commissioning for EN 50438 and VDE
0126 Grids”, p. 35
FR ISL. 60 Hz
French islands 60 Hz
Greece
GR CONTINENT
Greece/continent (49.5/50.5 Hz)
GR ISLAND
Greece/islands (47.5/51 Hz)
Italy
IT BT 21
Italy as per CEI 0-21:2012-06 for PV
systems equal to or less than 6 kW.
“8.5 Commissioning in Italy for PV Systems
Below 6 kW”, p. 41
IT BT 21 > 6kW
Italy as per CEI 0-21:2012-06 for PV
systems greater than 6 kW.
“8.3 Commissioning for EN 50438 and VDE
0126 Grids”, p. 35
Netherlands
NL
Netherlands
Poland
PL
Portugal
PT
Portugal
Romania
RO
Romania
Slovakia
SK
Slovakia
Spain
ES RD1699
Spain as per RD 1699
ES RD661
Spain as per RD 661
ES ISLAND
Spain/islands
United Kingdom
UK G59-2 230
United Kingdom as per G59-2 230 V
and 240 V
UK G59-2 240
UK 83-1
United Kingdom as per G83-1
The solar inverter must be set up with the same settings as another identical solar inverter.
“8.6 Commissioning by Loading Settings from
Other Solar Inverter”, p. 44
The solar inverter is a replacement device for another identical solar inverter.
“8.7 Commissioning After Replacing Solar
Inverter”, p. 47
The solar inverter should be newly set up and the grid to which the solar inverter is con-
nected is
not
shown in the list above.
You can set up a customer-specific grid.
Please contact Delta Support by phone.