39
Operation and Installation Manual for SOLIVIA 2.0/2.5/3.0/3.3/3.6/5.0 EU G4 TR
8. Commissioning
EN
➔
-------------------
continue
PDD: Standard
-------------------
PDD settings
9. Press the
buttons to select
continue
and then
press the button.
→ If the PDD setting is
User
, an extended
PDD Set-
tings
menu will be displayed. Continue with Step 10.
→ If the PDD setting is
Standard
or
Off
, the
Locked
Power Limit
menu will be displayed. Continue with
Step 12.
➔
continue
Umax: 253V
-------------------
PDD settings
10. To change the value, press the button and then set
the value using the
buttons. Press the button to
apply the value.
nOTE
: Steps 10 and 11 are only
necessary when the mode
User
was
set in Step 9.
Available Umax settings:
253 - 264 V (corresponds to 110 -
115% of 230 V), default is 253 V.
➔
-------------------
continue
Umax: 253V
-------------------
PDD settings
11. Press the
buttons to select
more
and then press
the button.
→ The
Locked Power Limit
menu is displayed.
➔
Smax: _._kVA
Pmax: _._kW
-------------------
Locked power limit
12. To change the value, press the button and then set
the value using the
buttons. Press the button to
apply the value.
nOTE
: If you change one of the val-
ues, you must fill out the provided
label after commissioning and place it
next to the type plate
nOTE
: The configured values can
only be changed with a PIN after com-
missioning.
nOTE
: The configured values are
displayed after commissioning in the
131 View Grid Setup menu.
➔
continue
Smax: _._kVA
Pmax: _._kW
-------------------
-------------------
Locked power limit
13. Press the
buttons to select
more
and then press
the button.
→ The
Power Balancing
menu is displayed.
➔
continue
Balancing: Off
-------------------
Power balancing
14. To change the settings, press the button and then
select the option using the
buttons. Press the
button to apply the setting.
nOTE
: The grid load can only be
balanced with a SOLIVIA Gateway M1
G2. If no gateway is connected, the
Balance
option will always be set to
Off
. Otherwise the solar inverter will
not feed into the grid.
➔
-------------------
continue
Balancing: Off
-------------------
Power balancing
15. Press the
buttons to select
continue
and then
press the button.
→ The
Format
menu is displayed.
➔
Time: 24h
Date: DD.MM.YYYY
-------------------
Format
16. To change the value, press the button and then set
the value using the
buttons. Press the button to
apply the value.
Available date formats:
DD.MM.YYYY | DD/MM/YYYY
DD-MM-YYYY | MM.DD.YYYY
MM/DD/YYYY | MM-DD-YYYY
YYYY.MM.DD | YYYY/MM/DD
YYYY-MM-DD
Available time formats:
12h | 24h
➔
continue
Time: 24h
Date: 25.05.2012
-------------------
-------------------
Format
17. Press the
buttons to select
continue
and then
press the button.
→ The
Date and Time
menu is displayed.