43
Operation and Installation Manual for SOLIVIA 2.0/2.5/3.0/3.3/3.6/5.0 EU G4 TR
8. Commissioning
EN
➔
Baudrate: 19200
ID: 1
-------------------
RS485
18. To change the value, press the button and then set
the value using the
buttons. Press the button to
apply the value.
nOTE
: If multiple solar inverters are
to be connected via RS485, select a
different ID for each inverter. The ID
is also used when saving and loading
settings in order to identify the solar
inverter.
Available IDs:
1 - 254
Available baudrates:
2400 | 4800 | 9600 | 19200 | 38400
➔
continue
Baudrate: 19200
ID: 1
-------------------
-------------------
RS485
19. Press the
buttons to select
continue
and then
press the button.
→ The completion screen will be displayed.
to reselect
ESC:
to confirm
ENTER:
20. Press the button.
→ The
610 IT Autotest
(Italy autotest) menu is dis-
played.
➔
AT Report 1
Perform autotest
-------------------
610 IT Autotest
21. Select
Perform autotest
using the
buttons, then
press the button to perform the autotest.
→ The autotest starts.
nOTE
: For PV systems greater than
6 kW, an autotest is not required
by CEI 0-21:2012-06. For this rea-
son, the menu will not be displayed
when the
IT BT 21 > 6kW
grid is
selected.
...test ongoing...
611 Perform autotest
22. The Autotest checks the proper operation of the grid and
system protection.
IT-Grid: 00.01.00
12.08.2012 09:23:35
Result: Pass
612 AT Report 1
23. The test result is displayed after the autotest is com-
pleted.
þ
If the autotest is successful, commissioning is complete.
nOTE
: The solar inverter may only
be put into operation when the overall
test result of the last autotest is
Pass
.
The reports for the last five autotests
are saved.
nOTE
: See Chapter
“12.6 Autotest for
Italy”, p. 77
for more detailed infor-
mation on the autotest.
nOTE
► The solar inverter offers some optional
functions available for all grids, see
“10 Set-
tings”, p. 52.
► When done with commissioning, save
the settings (see
“11.4 Saving Settings”,
p. 65
) and swap data (see
“11.6 Saving
Swap Data”, p. 67
) to a USB drive in
order to be able to use them later.