Test Operation
Si37-701
162
Test Operation
STEP 5
After completing the additional refrigerant charging, record the charging amount on
the accessory “REQUEST FOR THE INDICATON” label (Installation records) and
adhere it to the back side of the front panel. Also, record the factory charged
refrigerant amount, additional refrigerant amount in the field and total refrigerant
amount of the system to “ADDITIONAL REF. CHARGE” label and adhere in the
proximity of the refrigerant charge port. About “ADDITIONAL REF. CHARGE” label.
1.2.5.2.2 Procedure of check operation
Check operation perform the following work. Do the check operation following below.
Otherwise, malfunction code “U3” will be displayed in the remote controller and nomal
operation can not be carried out.
• Check of shutoff valve opening
• Check of miswiring
• Judgment of piping length
• Check of refrigerant overcharge
Note:
Check operation can not carried out at outdoor temp. less than -5°C.
Perform the check operation at day or time that outdoor temp. is -5°C or more.
[Check Operation Procedure]
STEP 1
Close the EL. COMPO. BOX lid and all front panels except as the side of the EL.
COMPO. BOX and turn on the power to the outdoor unit and all connected BS, indoor
units. (Be sure to turn the power on at least 6 hours before operation in order to have
power running to the crank case heater.)
STEP 2
Make the onsite settings as needed using the push button (BS1-BS5) on the outdoor
unit PC board (A1P) with the power on. (See
“1.2.6 Onsite Settings”
)
STEP 3
Perform the check operation following the Check Operation Method below. The
system operation for about 40~60 minutes and automatically stops the check
operation.
If the malfunction code is not displayed in the remote controller after the system stop,
check operation is completed. Normal operation will be possible after 5 minutes. If the
malfunction code is displayed in the remote controller, correct the malfunction
following [Remote controller displays malfunction code] and perform the check
operation again.
Note:
For interrupting the check operation, push RETURN button (BS3).
Check operation method
Note:
Make sure to open the equalizer (only for Multi system), suction pipe, dual pressure gas
pipe and liquid pipe shutoff valves completely.
• In the check operation, the following works will be automatically performed.
Check of miswiring / Check of shutoff valve opening / Check of refrigerant overcharge /
Judgment of piping length
• Make sure to carry out the check operation after the first installation.
Otherwise, the malfunction code "U3" will be displayed in the remote controller and normal
operation cannot be carried out.
When the check operation is finished normally, normal operation can be carried out after 5
minutes.
• For Multi system, check the setting and result on the master unit.
• The abnormality of each indoor unit can not be checked. After the check operation is finished,
check the indoor units individually by normal operation using the remote controller.
Summary of Contents for VRV III REYQ8PY1
Page 1: ...REYQ8 48PY1 R 410A Heat Recovery 50Hz Si37 701...
Page 59: ...Specifications Si37 701 48 Specifications...
Page 105: ...Refrigerant Flow for Each Operation Mode Si37 701 94 Refrigerant Circuit...
Page 230: ...Si37 701 Troubleshooting by Remote Controller Troubleshooting 219...
Page 374: ...Si37 701 Piping Diagrams Appendix 363 REYQ14P 16PY1 3D058153A S2NPL S1NPH...
Page 375: ...Piping Diagrams Si37 701 364 Appendix REMQ8PY1 3D057743...
Page 376: ...Si37 701 Piping Diagrams Appendix 365 REMQ10PY1 12PY1 3D057742...
Page 377: ...Piping Diagrams Si37 701 366 Appendix REMQ14PY1 16PY1 3D057741...
Page 382: ...Si37 701 Piping Diagrams Appendix 371 1 3 BS Unit 4D057985A...
Page 384: ...Si37 701 Wiring Diagrams for Reference Appendix 373 REYQ14 16PY1 3D056774C...
Page 385: ...Wiring Diagrams for Reference Si37 701 374 Appendix REMQ8PY1 3D055307E...
Page 386: ...Si37 701 Wiring Diagrams for Reference Appendix 375 REMQ10 12PY1 3D055308E...
Page 387: ...Wiring Diagrams for Reference Si37 701 376 Appendix REMQ14P 16PY1 3D055309E...
Page 392: ...Si37 701 Wiring Diagrams for Reference Appendix 381 FXCQ40M 50M 80M 125MVE 3D039557A...
Page 394: ...Si37 701 Wiring Diagrams for Reference Appendix 383 FXZQ20M 25M 32M 40M 50M8V1B 3D038359...
Page 395: ...Wiring Diagrams for Reference Si37 701 384 Appendix FXKQ25MA 32MA 40MA 63MAVE 3D039564C...
Page 399: ...Wiring Diagrams for Reference Si37 701 388 Appendix FXDYQ180M 200M 250MV1...
Page 402: ...Si37 701 Wiring Diagrams for Reference Appendix 391 FXMQ200MA 250MAVE 3D039621B...
Page 403: ...Wiring Diagrams for Reference Si37 701 392 Appendix FXHQ32MA 63MA 100MAVE 3D039801D...
Page 406: ...Si37 701 Wiring Diagrams for Reference Appendix 395 2 4 BS Unit 3D055928C...
Page 423: ...Piping Installation Point Si37 701 412 Appendix...
Page 427: ...Example of Connection R 410A Type Si37 701 416 Appendix...
Page 433: ...Method of Checking the Inverter s Power Transistors and Diode Modules Si37 701 422 Appendix...
Page 447: ...Si37 701 iv Index...
Page 451: ...Si37 701 viii Drawings Flow Charts...