
Si39-406
iv
Drawings & Flow Charts
a PCB for remote control, multiple core cable must
not be used ............................................ 53
Choosing a circuit breaker .................................. 54
Earthing .............................................................. 55
When cable more than 1.25 mm² is used ........... 53
Example for the Whole System............................... 185
example in case of refnet joint B ..................... 104
example in case of refnet joint C..................... 104
example in the case of refnet header.............. 104
LINE CONNECTION ........................................ 188
Example of Transmission Line Connection............... 86
Excessive noise due to incorrect angling
of REFNET joints ............................................. 127
F
Field line connection ....................................... 161
Field Setting From Outdoor Unit
Mode changing procedure .................................. 79
filling the tank .......................................................... 157
Flare Gauge .............................................................. 27
flare shape .............................................................. 155
Flaring Procedure...................................................... 28
Flaring tool .............................................................. 219
foundation bolts....................................................... 144
Front connection ..................................................... 147
G
Gauge manifold for R410A...................................... 221
Gist of Field Line Connection .................................. 186
H
How these installation problems
affect an equipment ............................................. 7
I
Inspecting and Handling the Unit ...................... 58
Operational steps ............................................... 15
Direction ............................................................. 16
interconnecting wiring ............................................. 165
K
Knock hole .............................................................. 147
knock holes ............................................................. 164
L
laying power wiring ..................................................162
Leak Test and Vacuum Drying ................................153
Leak tester ...............................................................221
M
Maximum concentration level ........................... 96
Mismatch between cables connecting indoor and
outdoor units and corresponding piping ...........124
Movement of the air flow flap...................................205
N
Name and Function of Each Switch and Display.....198
Names and functions of parts ..................................197
O
Outdoor Unit PC Board Layout ..................................67
P
passing piping out through the front ........................145
Picking power line and transmission line .................164
Pipe Insulation .........................................................156
Pipe size
Piping between refrigerant branch kits..............106
Piping Connection....................................................184
Piping System Diagrams
BS Unit ..............................................................120
Indoor Unit.........................................................119
Outdoor Unit ......................................................118
Positioning of indoor unit .............................................6
Positioning of outdoor unit ...........................................5
Power supply connection.........................................167
Precautions when selecting branch piping ..............149
Pressure down despite absence of leaks
during air tight test ............................................126
pressure regulator....................................................148
Program Dry Operation............................................203
Programming Start and Stop of
the System with Timer ......................................206
R
REFNET Header............................................. 111
REFNET Joint......................................... 109
Refrigerant Cylinders ...............................................217
refrigerant gas leak ..................................................182
Refrigerant oil (Air compal) ......................................221
Refrigerant Pipe Flushing
Fit blanking plugs ................................................23
Flushing...............................................................24
Open the main valve ...........................................23
Set pressure regulator on nitrogen cylinder ........23
Summary of Contents for REYQ96MTJU
Page 1: ...Design Installation Testing Instruction R410A Heat Recovery 60Hz REYQ96MTJU Si39 406...
Page 6: ...Si39 406 iv Table of Contents...
Page 34: ...Installation Si39 406 28 General Information Flaring Procedure...
Page 68: ...Installation Si39 406 62 General Information Caution Caution label 3P124617 4P124614...
Page 114: ...Appendix Si39 406 108 General Information 3P135887 1...
Page 126: ...Appendix Si39 406 120 General Information 7 8 3 BS Unit BSVQ36MVJ BSVQ60MVJ 4D045338...
Page 128: ...Appendix Si39 406 122 General Information 7 9 2 Field Wiring REYQ96MTJU 3D042647A...
Page 156: ...Refrigerant Piping Si39 406 150 Installation Manual REYQ96MTJU...
Page 158: ...Refrigerant Piping Si39 406 152 Installation Manual REYQ96MTJU...
Page 230: ...Precautions for New Refrigerant R410A Si39 406 224 Precautions for New Refrigerant R410...
Page 236: ...375 Park Avenue Suite 3308 New York N Y 10152 info daikinac com www daikinac com...