8.2
Test Run
CAUTION
After completing installation, be sure to open the valve. (Operating the unit with the valve shut will
break the compressor.)
Power supply
connection
When running the unit for the first time after installation, be sure to perform a test run following
these steps. (Not performing a test run when the unit is first installed may prevent the unit from
operating properly.)
During the operation, monitor the outdoor unit operation status and check for any incorrect
wiring.
1. Turn ON the power to the outdoor
units and indoor units.
3.
.
As necessary, configure the system
settings onsite by using the dipswitch
(DS1) on the outdoor unit PC-board
(A1P) and push button switches
(BS1 to 5).
Always perform configuration after turning ON the
power. To learn the setting method, refer to the
[Service Precautions] label attached at the
position shown in the figure on the right
(Electric box lid in outdoor unit).
(Remember, the actual settings you have made
must be recorded on the [Service Precautions]
label.)
2. Check the LED on the PC-board (A1P) in the outdoor unit to see if the data transmission
is performed normally.
Make sure to turn ON the power 6 hours before
starting the operation. This is necessary to warm
the crankcase preliminarily by the electric heater.
LED display
(Default status
before delivery)
One outdoor unit installed
Microcomputer
operation
monitor
Page
HAP
H1P
H2P
H3P
H4P
H5P
H6P
H7P
H8P
Ready/
Error
Cooler/heater changeover
Individual
Bulk
(parent)
Bulk
(child)
Low
noise
Demand
Multi
LED display:
OFF
ON
Blinking
4. Check if the shutoff valves are in
appropriate status and correct any
wrong status. (Refer to the table in
“
6-6 Additional Refrigerant Charge
”.)
5. Perform the check operation
following the instructions printed
on the [Service Precaution] label.
Do not leave any shutoff valve closed.
Otherwise the compressor will fail.
The system operates for about 15 minutes
(30 minutes at maximum) and automatically
stops the test operation. The system can start a
normal operation about 15 minutes after the test
operation, only if the remote controller displays
no error codes.
Caution
1
2
3
1. Electric box lid
2. Service lid
3. [Service precautions] Label location
Summary of Contents for REYQ96MTJU
Page 1: ...Design Installation Testing Instruction R410A Heat Recovery 60Hz REYQ96MTJU Si39 406...
Page 6: ...Si39 406 iv Table of Contents...
Page 34: ...Installation Si39 406 28 General Information Flaring Procedure...
Page 68: ...Installation Si39 406 62 General Information Caution Caution label 3P124617 4P124614...
Page 114: ...Appendix Si39 406 108 General Information 3P135887 1...
Page 126: ...Appendix Si39 406 120 General Information 7 8 3 BS Unit BSVQ36MVJ BSVQ60MVJ 4D045338...
Page 128: ...Appendix Si39 406 122 General Information 7 9 2 Field Wiring REYQ96MTJU 3D042647A...
Page 156: ...Refrigerant Piping Si39 406 150 Installation Manual REYQ96MTJU...
Page 158: ...Refrigerant Piping Si39 406 152 Installation Manual REYQ96MTJU...
Page 230: ...Precautions for New Refrigerant R410A Si39 406 224 Precautions for New Refrigerant R410...
Page 236: ...375 Park Avenue Suite 3308 New York N Y 10152 info daikinac com www daikinac com...