![background image](http://html1.mh-extra.com/html/daikin/reyq72/reyq72_serveice-manual_4175337084.webp)
SiUS39-602
Test Operation
73
Part 5
Test Operation
1.
Test Operation ......................................................................................74
1.1
Procedure and Outline ........................................................................... 74
1.2
Operation When Power is Turned On .................................................... 77
2.
Outdoor Unit PC Board Layout .............................................................78
3.
Field Setting ..........................................................................................79
3.1 Field Setting from Remote Controller..................................................... 79
3.2 Field Setting from Outdoor Unit ............................................................. 91
Summary of Contents for REYQ72
Page 35: ...Specifications SiUS39 602 24 Specifications...
Page 121: ...Field Setting SiUS39 602 110 Test Operation...
Page 129: ...Troubleshooting by Remote Controller SiUS39 602 118 Troubleshooting...
Page 225: ...Troubleshooting OP Unified ON OFF Controller SiUS39 602 214 Troubleshooting...
Page 232: ...SiUS39 602 Piping Diagrams Appendix 221 1 3 BS Unit BSVQ36MVJU BSVQ60MVJU 4D045338...
Page 235: ...Wiring Diagrams for Reference SiUS39 602 224 Appendix REYQ144 168 192MTJU C 3D050354A...
Page 240: ...SiUS39 602 Wiring Diagrams for Reference Appendix 229 2 4 BS Unit BSVQ36M 60MVJU 3D045069A...
Page 249: ...Example of Connection R 410A Type SiUS39 602 238 Appendix...
Page 255: ...Method of Replacing The Inverter s Power Transistors and Diode Modules SiUS39 602 244 Appendix...
Page 265: ...Precautions for New Refrigerant R 410A SiUS39 602 254 Precautions for New Refrigerant R 410A...
Page 269: ...SiUS39 602 iv Index...