Test Operation
SiUS39-602
74
Test Operation
1.
Test Operation
1.1
Procedure and Outline
Follow the following procedure to conduct the initial test operation after installation.
1.1.1 Check Work Prior to Turn Power Supply On
1.1.2 Turn Power On
Check on refrigerant piping
Check on amount of refrigerant
charge
(V3055)
Check the below items.
2
Power wiring
2
Control transmission wiring
between units
2
Earth wire
Is the wiring performed as specified?
Are the designated wires used?
Is the grounding work completed?
Use a 500V electrical insulation tester to measure the insulation.
2
Do not use a electrical insulation tester for other circuits than
200V (or 240v) circuit.
Are the setscrews of wiring not loose?
Is pipe size proper? (The design pressure of this product is
3.8MPa.)
Are pipe insulation materials installed securely?
Liquid and gas pipes need to be insulated. (Otherwise causes
water leak.)
Are respective stop valves on liquid, gas and oil equalizing lines
securely open?
Is refrigerant charged up to the specified amount?
If insufficient, charge the refrigerant from the service port of stop
valve on the liquid side with outdoor unit in stop mode after turning
power on.
Has the amount of refrigerant charge been recorded on “Record
Chart of Additional Refrigerant Charge Amount”?
Turn outdoor unit power on.
Carry out field setting on
outdoor PC board
Turn indoor unit power on.
(V3056)
{
Be sure to turn the power on 6 hours before starting operation to
protect compressors. (to power on clankcase heater)
{
For field settings, refer to “Field Settings” on and after P91.
After the completion of field settings, set to “Setting mode 1”.
Summary of Contents for REYQ72
Page 35: ...Specifications SiUS39 602 24 Specifications...
Page 121: ...Field Setting SiUS39 602 110 Test Operation...
Page 129: ...Troubleshooting by Remote Controller SiUS39 602 118 Troubleshooting...
Page 225: ...Troubleshooting OP Unified ON OFF Controller SiUS39 602 214 Troubleshooting...
Page 232: ...SiUS39 602 Piping Diagrams Appendix 221 1 3 BS Unit BSVQ36MVJU BSVQ60MVJU 4D045338...
Page 235: ...Wiring Diagrams for Reference SiUS39 602 224 Appendix REYQ144 168 192MTJU C 3D050354A...
Page 240: ...SiUS39 602 Wiring Diagrams for Reference Appendix 229 2 4 BS Unit BSVQ36M 60MVJU 3D045069A...
Page 249: ...Example of Connection R 410A Type SiUS39 602 238 Appendix...
Page 255: ...Method of Replacing The Inverter s Power Transistors and Diode Modules SiUS39 602 244 Appendix...
Page 265: ...Precautions for New Refrigerant R 410A SiUS39 602 254 Precautions for New Refrigerant R 410A...
Page 269: ...SiUS39 602 iv Index...