SiUS39-602
Field Setting
Test Operation
109
3.2.8 Power Transistor Check Operation
When the inverter system malfunctions (malfunction of inverter, INV compressor), to locate
where the malfunction occurs, switching to the power transistor check mode of inverter in the
service mode setting enables not to judge the position detection signal malfunction but to output
waveform only during inverter operation. (The waveform can be checked by disconnecting the
wiring of compressor.)
After the completion of checks, return the system to the previous mode and wait for 30 seconds
or more until the discharge of capacitor is completed. Then, conduct a subsequent work.
Note:
Be sure to disconnect the compressor wiring when conducting the check operation mentioned
above.
When the output voltage is approx. 100~200 V (10 Hz) and the voltage balance between
phases U-V, V-W, W-U is within ±5%, the inverter PCB is normal.
Refer the detail power transistor check to page 213.
Summary of Contents for REYQ72
Page 35: ...Specifications SiUS39 602 24 Specifications...
Page 121: ...Field Setting SiUS39 602 110 Test Operation...
Page 129: ...Troubleshooting by Remote Controller SiUS39 602 118 Troubleshooting...
Page 225: ...Troubleshooting OP Unified ON OFF Controller SiUS39 602 214 Troubleshooting...
Page 232: ...SiUS39 602 Piping Diagrams Appendix 221 1 3 BS Unit BSVQ36MVJU BSVQ60MVJU 4D045338...
Page 235: ...Wiring Diagrams for Reference SiUS39 602 224 Appendix REYQ144 168 192MTJU C 3D050354A...
Page 240: ...SiUS39 602 Wiring Diagrams for Reference Appendix 229 2 4 BS Unit BSVQ36M 60MVJU 3D045069A...
Page 249: ...Example of Connection R 410A Type SiUS39 602 238 Appendix...
Page 255: ...Method of Replacing The Inverter s Power Transistors and Diode Modules SiUS39 602 244 Appendix...
Page 265: ...Precautions for New Refrigerant R 410A SiUS39 602 254 Precautions for New Refrigerant R 410A...
Page 269: ...SiUS39 602 iv Index...