SiUS39-602
Field Setting
Test Operation
107
[Operation procedure detail]
c
After turning the respective power supply switch of indoor and outdoor units off and charging
the refrigerant, turn on the power of indoor and outdoor units.
Do not fail to turn the power off and charge the refrigerant with outdoor unit in stop mode
before adding the refrigerant following this procedure, otherwise resulting in trouble.
d
Fully open the stop valve on the gas side and oil equalizing valve for multi outdoor
connection, and do not fail to fully close the stop valve on the liquid side. (If the stop valve on
the liquid side is open, the refrigerant cannot be charged.)
e
In
Setting mode 2
(H1P : ON) with outdoor unit in stop mode, Set “Additional refrigerant
charging operation” switch to ON to start the operation. (H2P turns to display TEST
OPERATION (blinks), and “TEST OPERATION” and “UNDER CENTRALIZED CONTROL”
are displayed on the remote controller.)
f
When the refrigerant is charged up to the specified amount, press the RETURN button
(BS3) to stop charging.
The charging operation is automatically stopped after operating for a maximum of about 30
minutes.
If the charging is not complete within 30 minutes, set the Additional refrigerant charging
operation again to start charging. When the charging immediately stops even by restarting,
the refrigerant is charged excessively. The refrigerant cannot be charged any more.
g
Do not fail to fully open the stop valve on the liquid side
as soon as disconnecting the
refrigerant charging hose.
(The piping may be burst due to the liquid sealing.)
[Operation state]
•
Compressor frequency : 210Hz
•
Y4S, Y7S, Solenoid valve : Open Y1E, Y2E electronic expansion valve : 1400 pulse
•
Outdoor unit fan : High pressure control
•
Indoor unit expansion valve (All unit) : 1024 pulse
•
Indoor unit fan : H tap
3.2.5 Setting of Refrigerant Recovery Mode
When carrying out the refrigerant collection on site, fully open the respective expansion valve of
indoor and outdoor units
All indoor and outdoor unit’s operation are prohibited.
[Operation procedure]
c
In
setting mode 2
with units in stop mode, set “B Refrigerant Recovery / Vacuuming mode”
to ON. The respective expansion valve of indoor and outdoor units are fully opened. (H2P
turns to display “TEST OPERATION” (blinks), “TEST OPERATION” and “UNDER
CENTRALIZED CONTROL” are displayed on the remote controller, and the all indoor and
outdoor unit operation is prohibited.
After setting, do not cancel “Setting Mode 2” until completion of refrigerant recovery
operation.
d
Collect the refrigerant using a refrigerant recovery unit. (See the instruction attached to the
refrigerant recovery unit for more detal.)
e
Press Mode button “BS1” once and reset “Setting Mode 2”.
Summary of Contents for REYQ72
Page 35: ...Specifications SiUS39 602 24 Specifications...
Page 121: ...Field Setting SiUS39 602 110 Test Operation...
Page 129: ...Troubleshooting by Remote Controller SiUS39 602 118 Troubleshooting...
Page 225: ...Troubleshooting OP Unified ON OFF Controller SiUS39 602 214 Troubleshooting...
Page 232: ...SiUS39 602 Piping Diagrams Appendix 221 1 3 BS Unit BSVQ36MVJU BSVQ60MVJU 4D045338...
Page 235: ...Wiring Diagrams for Reference SiUS39 602 224 Appendix REYQ144 168 192MTJU C 3D050354A...
Page 240: ...SiUS39 602 Wiring Diagrams for Reference Appendix 229 2 4 BS Unit BSVQ36M 60MVJU 3D045069A...
Page 249: ...Example of Connection R 410A Type SiUS39 602 238 Appendix...
Page 255: ...Method of Replacing The Inverter s Power Transistors and Diode Modules SiUS39 602 244 Appendix...
Page 265: ...Precautions for New Refrigerant R 410A SiUS39 602 254 Precautions for New Refrigerant R 410A...
Page 269: ...SiUS39 602 iv Index...