Part
3. Commissioning Procedure
DCM014A51
Design Guide
113
4. Commissioning the BACnet® Server Gateway on the
iTM
4.1
iTM BACnet
Server Gateway Activation
1. From the Service Settings tab of the
iTM
, click on the Activation icon.
2. On the Activation Setup page, click the Add button to open the keyboard dialog box, and enter
the activation key for the
iTM BACnet
Server Gateway option.