A.C. GENERATOR(CHARGING COIL)
INSPECTION
·
This test is done with the starter mounted to the
engine.
●
Remove the luggage box.
(
3-3 )
●
Disconnect the AC generator coupler.
(
3-3 )
●
Measure the resistance of the charging coil (between
the white wire and ground) and the lighting coil
(between the yellow wire and ground).
STANDARD RESISTANCE (20
℃
)
BETWEEN WHITE WIRE AND GROUND : 0.3~1.2
Ω
BETWEEN YELLOW WIRE AND GROUND : 0.1~1.0
Ω
RESISTER INSPECTION
●
Remove the front cover.
(
3-5 )
●
Measure the resistance between the register lead wire
and ground.
STANDARD VALUE (20
℃
)
RESISTER (6.7
Ω
5W) GREEN/BLACK/BODY GROUND : 6.3~7.1
Ω
RESISTER (5.9
Ω
30W)PINK/BODY GROUND : 5.6~6.5
Ω
·
Problems with the resister are caused by operational
problems of the starter.
13-9
CHARGING SYSTEM/A.C.GENERATOR
ACG
COUPLER
Summary of Contents for A-FOUR -
Page 1: ......
Page 44: ...4 2 LUBRICATION SYSTEM OIL SYSTEM DRAWING ...
Page 51: ...MEMO ...
Page 52: ...FUEL SYSTEM 5 0 FUEL GAUGE FUEL TANK FUEL AUTO COCK STRAINER CARBURETOR ...
Page 62: ...ENGINE REMOVAL INSTALLATION 6 0 ...
Page 97: ...MEMO ...
Page 128: ...BRAKE SYSTEM 12 0 ...
Page 140: ...MEMO ...
Page 150: ...MEMO ...
Page 158: ...MEMO ...
Page 166: ...MEMO ...
Page 174: ...MEMO ...
Page 175: ...17 1 17 WIRING DIAGRAM 17 ...
Page 176: ...MEMO ...
Page 184: ...MEMO ...
Page 185: ...SERVICE MANUAL 2005 6 PRINTED 2005 6 PUBLICATION NO COPY ...