CTI 2572-A Installation and Operation Guide
64
SYMPTOM
PROBABLE CAUSE
CORRECTIVE ACTION
DHCP) and set the Module ID switches to
the appropriate setting. Then reset the
module.
OR
Set the module startup switch to the PLC
Start position and use the PLC interface to
set the IP parameters (see
Section
4.2.
Start Network Server Command Block
)
MS LED is Steady Green,
NS LED is Off
The module is waiting on the PLC to
start the network server.
Ensure the PLC is in run mode and that the
2572-A is properly entered in the PLC I/O
configuration.
Check the PLC logic. See
Section
8.7. PLC
Logic Problems.
Summary of Contents for 2572-A
Page 8: ......
Page 16: ......
Page 28: ......
Page 32: ......
Page 60: ......
Page 84: ......
Page 96: ......
Page 104: ...CTI 2572 A Installation and Operation Guide 96 WX WY Quick Reference...
Page 112: ......
Page 116: ......
Page 126: ......
Page 130: ...CTI 2572 A Installation and Operation Guide 122 WX WY Quick Reference...