Use and maintenance manual
ZED 23.2 JH
Code n°UM0260_GB
27
Stabilise the machine correctly, proceeding as follows:
fig. 4.3.4
•
Make the outriggers descend by alternately activating the
levers (
pos. 1-2-3-4 fig. 4.3.4
)
.
By activating them downwards
the outriggers descend, activating them upwards the
outriggers retract. Make the outriggers exit completely in a
way to lift the truck and discharge the suspensions.
•
Observe the spirit level (
pos. 5 fig. 4.3.4
) situated at the side
of the outrigger controls and correctly level the truck, by
appropriately activating the outrigger levers. The machine
is levelled correctly when the air bubble, inside the
indicator, is positioned in the central section (0°).
•
Check that the LEDs have switched on (
pos. 3 fig. 4.3.3
), that
indicate the consent for boom ascent.
ATTENTION:
make sure that the machine is stabilised correctly before climbing on
board: lifting carriage levelled, suspensions discharged with all four
outriggers resting on suitable ground.
ATTENTION:
LED switch on does not indicate the correct stabilisation of the truck. This
is determined by the spirit level.
ATTENTION:
if the ground is not suitable to support the weight, use adequate planks for
this purpose and check before use.
OBLIGATION:
put the helmet on before climbing on board.
OBLIGATION:
before moving to any height it is mandatory to check the correct
stabilisation of the machine, controlling the effective closure of the block
valves installed on the outriggers.
If this should not occur, contact the after-sales centre.
OBLIGATION:
put the harnessing on before climbing on board.
•
Start the platform as described in
chap. 4.3.3
.
4.3.3 Starting the platform
Start the platform as follows
•
turn the key selector switch (
pos.1 fig. 4.3.6
) into the “Work platform” position (
pos.12
fig. 4.3.6
).
•
remove the key and keep it with you
•
check the integrity of the I.P.D. before use
•
put the harnessing and any other IPD on before climbing on board
•
carefully climb onto the work platform
•
check that the access gate is closed
1
2
3
4
5
6
Summary of Contents for ZED 23.2 JH
Page 2: ......
Page 13: ...Use and maintenance manual ZED 23 2 JH Code n UM0260_GB 11 2 5 Work area...
Page 47: ...Use and maintenance manual ZED 23 2 JH Code n UM0260_GB 45...
Page 50: ...Use and maintenance manual ZED 23 2 JH Code n UM0260_GB 48 7 HYDRAULIC PLANT LAYOUT...
Page 51: ...Use and maintenance manual ZED 23 2 JH Code n UM0260_GB 49 8 ELECTRIC WIRING DIAGRAM...