61
VIII. Electrical
(continued)
d. Multiple Boiler Setup
Step
Description
Comments
1
Install and wire the Header
Sensor
Wire the header sensor to low voltage terminal strip terminals “Header sensor”.
NOTE
This step can not be skipped. The Sequence Master can not be “enabled”unless a Header
Sensor is installed.
2
Install Ethernet Cables
between boilers
Standard Ethernet type cables with RJ45 connectors are “plugged in” to the Boiler-to-Boiler
Communication Network connection located on the side of the boiler. When more than two
boilers are connected an RJ45 splitter may be used to connect the boilers. Refer to Figure
31.
3
Apply Power to All Boilers
4
Set Unique Boiler
Addresses
Assign all boilers a
unique
Boiler Address using any number from 1 through 8.
WARNING
When two boiler’s addresses are the same undesirable simultaneous operation occurs.
5
Enable 1 Boiler Master
Enable
only one
Control’s Sequencer Master.
WARNING
When more than one Sequencer Master is enable erratic behavior will result.
6
Power Down All Boilers
7
Power Up Master
Sequencer
“Enabled” Boiler First
8
Power Up Other Boilers
9
Confirm Communication
From the Home Screen of the Control with the Master Sequencer “enabled”, select the Status
button. The Sequencer display shows the boiler address of the communicating boilers.
Additionally, from the “Home” screen select the “Detail” button and then the “Networked
Boilers” buttons to view boiler communication status.
If a boiler is not shown, check Ethernet cable connections and confirm all boilers have unique
addresses.
Summary of Contents for Phantom-X PHNTM210
Page 7: ...7 Figure 1B Model PHNTM285 I Product Description Specifications and Dimensional Data continued...
Page 52: ...52 VIII Electrical continued...
Page 53: ...53 VIII Electrical continued Figure 26 Wiring Connections Diagram...
Page 54: ...54 VIII Electrical continued Figure 27 Ladder Diagram...
Page 118: ...118...
Page 119: ...119...