11
Listed Direct
Vent System
Vent Pipe Material
Vent Pipe
Direction
Enclosure
Vent Pipe
Nominal Diameter
Minimum
Clearance to
Combustible
Material
Factory Standard
Two-Pipe CPVC/PVC Vent and PVC Combustion
Air Intake
* CPVC/PVC
Vertical or
Horizontal
Unenclosed
at all Sides
3 in. (80 mm)
or
4 in.( 100 mm)
1 in. (25 mm)
Available Optional
Two-Pipe Rigid Polypropylene Vent (or, Flexible
Polypropylene Liner for Vertical Venting only) and
Rigid Polypropylene or PVC Combustion Air Intake
Pipe Rigid Polypropylene
Vent (or, Flexible
Polypropylene Liner for
Vertical Venting only)
3 in. (80 mm)
or (110 mm)
or
4 in. (100 mm)
or (110 mm)
1 in. (25 mm)
Available Optional
Two-Pipe Stainless Steel Vent and Galvanized Steel
or PVC Combustion Air Intake
Stainless Steel
3 in. (80 mm)
or
4 in.( 100 mm)
1 in. (25 mm)
Figure 2: Clearances To Combustible and Non-combustible Material, Floor Standing
III. Pre-Installation and Boiler Mounting
(continued)
Summary of Contents for Phantom-X PHNTM210
Page 7: ...7 Figure 1B Model PHNTM285 I Product Description Specifications and Dimensional Data continued...
Page 52: ...52 VIII Electrical continued...
Page 53: ...53 VIII Electrical continued Figure 26 Wiring Connections Diagram...
Page 54: ...54 VIII Electrical continued Figure 27 Ladder Diagram...
Page 118: ...118...
Page 119: ...119...