4
TABLE OF CONTENTS
I.
Product Description, Specifications and Dimensional Data......................
5
II.
Unpacking Boiler........................................................................................ 8
III. Pre-Installation and Boiler Mounting ........................................................
9
IV. Venting...................................................................................................... 14
A. General Guidelines............................................................................... 14
B. CPVC/PVC Venting.............................................................................. 19
C. Polypropylene Venting......................................................................... 25
D. Stainless Steel Venting........................................................................ 28
E. Removing the Existing Boiler...............................................................
31
F. Multiple Boiler Installation Venting....................................................... 32
V.
Condensate Disposal................................................................................. 34
VI. Water Piping and Trim............................................................................... 36
VII. Gas Piping ............................................................................................... 46
VIII. Electrical ................................................................................................... 50
IX. System Start-up ....................................................................................... 62
X. Operation...................................................................................................... 70
A. Overview............................................................................................... 70
B. Supply Water Temperature Regulation................................................ 71
C. Boiler Protection Features.................................................................... 72
D. Multiple Boiler Control Sequencer........................................................ 73
E. Boiler Sequence of Operation.............................................................. 74
1. Normal Operation........................................................................... 74
2. Using The Display..........................................................................
75
F. Viewing Boiler Status............................................................................ 76
1. Status Screens.............................................................................. 76
2. Detail Screens............................................................................... 78
3. Multiple Boiler Sequencer Screens................................................ 79
G. Changing Adjustable Parameters........................................................
80
1. Entering Adjust Mode.................................................................... 80
2. Adjusting Parameters..................................................................... 80
XI. Service and Maintenance ........................................................................ 98
XII.
Troubleshooting........................................................................................
104
XIII. Repair Parts ............................................................................................. 109
Summary of Contents for Phantom-X PHNTM210
Page 7: ...7 Figure 1B Model PHNTM285 I Product Description Specifications and Dimensional Data continued...
Page 52: ...52 VIII Electrical continued...
Page 53: ...53 VIII Electrical continued Figure 26 Wiring Connections Diagram...
Page 54: ...54 VIII Electrical continued Figure 27 Ladder Diagram...
Page 118: ...118...
Page 119: ...119...