MOVING AND INSTALLATION
Section 3
3-8
1.
For best performance, the band saw has to be placed on a solid and level foundation.
The floor is recommended to have a carrying capacity of approximately 5 tons
(including both machine and material weight).
2.
It also has to be bolted to the floor, and it has to have shock absorption pads on the
floor for level regulating.
3.
You have to leave sufficient space for operator and large material supplies. It will
ensure safety.
4.
If a crane is used to lift the machine, make sure that the lifting cable is properly
attached to the machine as shown below:
NOTE:
Be careful to protect the machine from impact or shock during this procedure.
Also watch out for your fingers and feet.
5.
Other machinery may cause vibration or dust for your machine. It will prevent machine
from working effectively. You have to avoid this kind of situation.
Machine leveling
Place spirit levels on the vise slide plates and the work feed table, and adjust the left-
and-right and fore-and-aft level of the machine with leveling bolts.
NOTE:
Be sure to ascertain that all leveling bolts evenly support the weight of the
machine.
NOTE:
Use a level gauge to make sure that
the platform is flat and even at all
angles.
Installation of feed roller
If you plan to cut long work pieces, please
arrange the roller table and roller stand behind the
machine.
NOTE:
The roller table and roller stand should be level
with the machine itself.
Cutting fluid supply
Page 30
Instruction Manual for AH-250H (B040)
04/12/2014
Summary of Contents for AH-250H
Page 7: ...Section 1 SAFETY RULES Page 7 Instruction Manual for AH 250H B040 04 12 2014 ...
Page 13: ...Section 2 GENERAL INFORMATION Page 13 Instruction Manual for AH 250H B040 04 12 2014 ...
Page 21: ...GENERAL INFORMATION Section 2 2 8 Page 21 Instruction Manual for AH 250H B040 04 12 2014 ...
Page 22: ...Section 3 MOVING INSTALLATION Page 22 Instruction Manual for AH 250H B040 04 12 2014 ...
Page 33: ...Section 4 OPERATION INSTRUCTION Page 33 Instruction Manual for AH 250H B040 04 12 2014 ...
Page 56: ...Section 5 ELECTRICAL SYSTEM Page 56 Instruction Manual for AH 250H B040 04 12 2014 ...
Page 69: ...Section 6 HYDRAULIC SYSTEM Page 69 Instruction Manual for AH 250H B040 04 12 2014 ...
Page 79: ...Section 8 MAINTENANCE SERVICE Page 79 Instruction Manual for AH 250H B040 04 12 2014 ...
Page 84: ...Page 84 Instruction Manual for AH 250H B040 04 12 2014 ...
Page 85: ...Section 9 SYSTEM TROUBLE SHOOTING Page 85 Instruction Manual for AH 250H B040 04 12 2014 ...
Page 93: ...Section 10 PART LIST Page 93 Instruction Manual for AH 250H B040 04 12 2014 ...