9. Checklist
48
EN
To ensure the correct installation of a CONVOTHERM combi steamer and a successful guideline for the
customer, we recommend, both the installer and the customer, filling out and signing the Checklists
"9.1
Installation inspection"
and
"9.2 User information"
.
Copy both Checklists or simply tear out.
Unit installation site : ____________________________________________________________________
Unit number (from nameplate): _____________________________________________________________
Part number (from nameplate): _____________________________________________________________
9.1
Installation inspection
For the CONVOTHERM combi steamers to operate smoothly, they must be mounted and connected
according to the information in this Installation Manual (
→
Chapter 1.1 to 9.2 and if required 11) by a
trained service specialist.
Check particularly the following points!
yes!
Installation
→
→
→
→
Chapter 2
•
Were the agreed applications observed by the installer
(
→
Chapter 1
, Safety advice)?
•
Has the combi steamer been installed level?
•
Have the safety distances been adhered to?
•
Is the distance to other heating units a min. 500 mm?
•
Is the distance to fryers, grease baking units, (open cooking units with hot fat) greater than the
working radius of the hand shower?
Attention: When water sprays in hot grease, there is a danger of burns to the user and a
danger of fire.
•
Has ventilation been maintained underneath the unit? This means that there are no objects or
materials blocking or altering the unit. (
→
Chapter 7
, Gas exhaust conduction).
•
Are the gas in and out passageways clear and not blocked or covered?
Electric connection
→
→
→
→
Chapter 3
•
Has the on site electrical fuse protection been checked?
•
Has an
all-pole isolation switch
with a minimum contact opening of 3 mm been assembled
close to the unit (by customer)?
The unit must be isolated during cleaning, installation or repair work!
•
Does the unit have an equipotential?
•
Is the unit, in accordance with current installation regulations, protected against residual current
using circuit breakers with an applicable current rating?
•
Does the combi steamer have its own fuse protection and have no other addititonal units on the
same fuse protection?
Checklist Page 1 from 4
Summary of Contents for OEB 10.10
Page 7: ...Notizen 3 DE...
Page 37: ...Notes 33 EN...
Page 67: ...Notes 63 FR...
Page 113: ...Bilder pictures Images Afbeeldingen Figuras 19 6 20 7 21 11 1 22 11 2 23 11 2...
Page 114: ...Bilder pictures Images Afbeeldingen Figuras 24 11 3 25 11 3...
Page 115: ...Bilder pictures Images Afbeeldingen Figuras 26 11 4 27 11 4 28 11 4 29 11 6 30 12 31 12...