Operating Instructions
Insulated Conductor Rail System
SinglePowerLine Program 0813
BAL0813-0007-EN
www.conductix.com
translated document
page 51 of 108
Fig. 49: Hanger clamps with square nuts mounted in the support arm
Fig. 50: Hanger clamps with hexagon nuts mounted with retaining
plate
Requirements:
The support structure (e.g., support arm or retaining plate) is mounted at the appropriate distance (see project-specific documents).
Distance between hanger clamps:
Hanger clamp to end cap: ≥ 250
mm (up to max. 400 mm)
Hanger clamp to hanger clamp: ≤ 2500 mm
Work steps (mounting with support arm/C-rail):
→
Slide the first hanger clamp onto the support arm/C-rail (see Fig. 51). Please refer to the project-specific documents for the exact
dimensions.
→
Tighten the first hanger clamp with an open-end wrench SW 17 (14 Nm) (see Fig. 52).
→
Slide the next hanger clamp into the support arm/C-rail (see Fig. 53).
Fig. 51: Slide the first hanger clamp onto the support arm
Fig. 52: First hanger clamp slid onto the support arm and tightened