Operating Instructions
Insulated Conductor Rail System
SinglePowerLine Program 0813
BAL0813-0007-EN
www.conductix.com
translated document
page 59 of 108
Fig. 74: Slide the second end of the rail into the connector
Fig. 75: Tighten M10 nuts
→
Slide the insulating cap halves of the connector over the connection point (see Fig. 76) and tighten the two fillister head tapping
screws (Pos. 6) (see Fig. 77).
Fig. 76: Slide the insulating cap halves of the connector over the
connection point
Fig. 77: Screw on the insulating cap halves of the connector
Fig. 78: The clamping plate of the connector lies in the hollow profile
of the connector
Fig. 79: Connection point 0813 with insulating cap halves
6
7