Operating Instructions
Insulated Conductor Rail System
SinglePowerLine Program 0813
BAL0813-0007-EN
www.conductix.com
translated document
page 62 of 108
Fig. 82: Mount connector with tubular cable lug
→
Crimp the stripped end of the connecting cable (Pos. 2) with the tubular cable lug (Pos. 5).
Fig. 83: Crimp cable end (Pos. 2) with tubular cable lug
→
Slide the two insulating cap halves (Pos. 1) together and screw in with two fillister head screws (Pos. 6) (see Fig. 84 and Fig.
85).
Fig. 84: Slide insulating cap halves together (Pos. 1)
Fig. 85: Screw in insulating cap halves with fillister head screws
(Pos. 6)
2
5
5
2
1
6