Work steps (for retaining plate with through holes):
→
Loosen the screw connection with the hexagon nut and washers from the hanger clamp (see Fig. 56).
Fig. 56: Loosen the screw connection from the hanger clamp
→
Insert the hanger clamp into the hole in the retaining plate and tighten the screw connections from above with an open-end
wrench SW 17 (14 Nm) (see Fig. 57 through Fig. 59). The retaining clamp of the hanger clamp must be rotatable. A
subsequent alignment is not necessary.
→
Mount the other hanger clamps in the same way.
Fig. 57: Insert the hanger clamp into the first hole in the retaining plate
Fig. 58: The hanger clamp is screwed on from above
Fig. 59: All hanger clamps are mounted