Chapter 3 — Commissioning
Part No. 750-386
3-17
3.13.1 - Pump Rotation
Pump rotation is only available on common header applications.
This feature allows for automatic pump Lead Lag order rotation
based on pump rotation elapsed time.
Upon pump rotation:
• Lag 1 pump becomes Lead.
• Lead pump becomes last Lag pump.
Pump rotation time accumulates any time a pump selected as
AUTO is running.
When Pump Rotation Elapsed Time is equal to the Pump Rotation
Time hours the pump will automatically rotate and the Rotation
Elapsed Time will be reset to 0.
Figure 3-18 Pump Configuration (not logged in)
Summary of Contents for ADAC 1000
Page 1: ...750 386 05 2017 ADAC 1000 Deaerator Control Operation Manual...
Page 22: ...Chapter 2 System Components 2 12 Part No 750 386...
Page 92: ...Chapter 5 Input Output Lists 5 6 Part No 750 386...
Page 93: ...www cleaverbrooks com Chapter 6 Parts Parts List 6 2...
Page 120: ...A 26 Part No 750 386...
Page 128: ...APPENDIX B ADAC 1000 ProtoNode Tags B 8 Part No 750 386...
Page 132: ...APPENDIX C Loading a PLC Program C 4 Part No 750 386...
Page 138: ...APPENDIX D Deaerator Reference Drawings D 6 Part No 750 386 Duo Tank Components typical...
Page 139: ......
Page 140: ...e mail info cleaverbrooks com Web Address http www cleaverbrooks com...