Figure 180: Installing the left vertical air plenum
Step 4
Install the vertical air plenum to the right of the horizontal air plenum. Follow step 3a to step 3c.
Figure 181: Installing the right vertical air plenum
Step 5
Install the horizontal air plenum above the vertical plenums. Follow step 3a to step 3c.